background image

When applying siding, brick veneer or other exterior finish material, leave adequate space between 
the door frame and the material for sealant. Refer to the illustration that corresponds to your 
finish material.

Note: The sealant details shown are standard recommendations from the sealant industry. Contact 
your sealant supplier for recommendations and instructions for these and any other applications.

5

SEALING THE DOOR TO THE EXTERIOR WALL CLADDING

A. 

Install the hardware.

 Refer to the instructions 

INCLUDEDINTHEHARDWAREBOX

B. 

Insert closed cell foam backer rod into the space

 

AROUNDTHEDOORSOTHEREISAPPROXIMATELYTO

CLEARANCEBETWEENTHEBACKERRODANDTHEEXTERIORFACE

of the door.

Note: Backer rod adds shape and depth for the 
sealant line.

C. 

Apply a bead of high quality exterior grade sealant 

to the entire perimeter of the door. At each end of 
the bottom of the door, insert sealant into the spaces 
between the bottom of door and the sill support and 
connect it to the perimeter sealant.

D. 

Shape, tool and clean excess sealant.

7HENlNISHED

the sealant should be the shape of an hourglass.

Note: This method creates a more flexible sealant 
line capable of expanding and contracting.

E. 

Remove plastic guards

 at the base of the door 

once construction is complete.

#3*$,7&/&&3

$MFBSBODF

#BDLFS3PEBOE

4FBMBOUUZQJDBM

1FSJNFUFS4FBMBOU

NVTUFYUFOEUP

SPPNTJEFPG

"DDFTTPSZ(SPPWF

"DDFTTPSZ(SPPWF

*OTVMBUJOH

'PBN

.JO

7*/:-45&&-

4*%*/(

$MFBSBODF

#BDLFS3PEBOE

4FBMBOUUZQJDBM

*OTVMBUJOH

'PBN

1FSJNFUFS4FBMBOU

NVTUFYUFOEUP

SPPNTJEFPG

"DDFTTPSZ(SPPWF

"DDFTTPSZ(SPPWF

.JO

$MFBSBODF

4FBMBOUUZQJDBM

*OTVMBUJOH

'PBN

"DDFTTPSZ

(SPPWF

800%

4*%*/(

$MFBSBODF

*OTVMBUJOH

'PBN

4FBMBOUUZQJDBM

1FSJNFUFS4FBMBOU

NVTUFYUFOEUP

SPPNTJEFPG

"DDFTTPSZ(SPPWF

"DDFTTPSZ(SPPWF

.JO

800%4*%*/(

8*5)53*.

x

Содержание 80JJ0103

Страница 1: ...oject may require an installation method different from these instructions and additional care Determining the appropriate installation method is the responsibility of you your architect or constructi...

Страница 2: ...OUFSJPS YOU WILL NEED TO SUPPLY TOOLS REQUIRED s EDAR OR MPERVIOUS SHIMS SPACERS TO s GALVANIZED ROOlNG NAILS LB s D NAIL s LOSED CELL FOAM BACKER ROD SEALANT BACKER TO FT s 0ELLA SmartFlash foil back...

Страница 3: ...t the bottom of the opening then tilt the top into position Center the door between the sides of the opening to allow clearance for SHIMMING AND INSERT ONE ROOlNG NAIL IN THE lRST HOLE FROM THE CORNER...

Страница 4: ...Only Use the construction handle to operate the active door panel Operate the ushbolts per the instructions on the label on the strike located on the astragal Architect Series Only Use the constructi...

Страница 5: ...and bottom screws and immediately retighten them With the screws retightened turn the adjustment hinge screw If the hinge will not adjust any further then it is adjusted as far as it will go If more...

Страница 6: ...the door operation by opening and closing the door Note If the door does not operate correctly check to make sure it is still plumb level square and that the sides are not bowed If adjustments are re...

Страница 7: ...h quality exterior grade sealant to the entire perimeter of the door At each end of the bottom of the door insert sealant into the spaces between the bottom of door and the sill support and connect it...

Страница 8: ...r use tools that might damage the surface 5SE OF INAPPROPRIATE lNISHES SOLVENTS BRICKWASH OR CLEANING CHEMICALS WILL CAUSE ADVERSE REACTIONS with window and door materials and voids the Limited Warran...

Отзывы: