background image

YOU WILL NEED TO SUPPLY:

s#EDAROR)MPERVIOUSSHIMSSPACERSTO 

sGALVANIZEDROOlNGNAILSLB 

sXCORROSIONRESISTANTWOODSCREWSTO 

s#LOSEDCELLFOAMBACKERRODSEALANTBACKERTOFT 

s(IGHQUALITYEXTERIORGRADEPOLYURETHANEORSILICONE

sealant (1 tube per window)

s'REAT3TUFF

 Window and Door Insulating Foam 

Sealant by the Dow Chemical Company or equivalent 

LOWPRESSUREPOLYURETHANEWINDOWANDDOORFOAM

  DO NOT use high pressure or latex foams

s)NTERIORTRIMANDORJAMBEXTENSIONSTOFT 

TOOLS REQUIRED:

s4APEMEASURE

s,EVEL

s3QUARE

s(AMMER

s3TAPLER

s3EALANTGUN

s3CISSORSORUTILITYKNIFE

s3MALLmATBLADESCREWDRIVER

s$RILLBITSAND

s$RILL

s0OWERSCREWDRIVERWITH
 0HILLIPSBIT

4&"-"/5

4&"-"/5

A. 

Verify the opening is plumb and level.

Note: It is critical that the bottom is level.

1

ROUGH OPENING PREPARATION

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

B. 

Verify the window will fit

 the opening. 

Measure all four sides of the opening to 

MAKESUREITISLARGERTHANTHEWINDOW

in both width and height. On larger 
openings measure the width and height 
in at least three places to check for bowed 
header or studs.

Note: 1-1/2" or more of solid wood 
blocking is required around the perimeter 
of the opening. Fix any problems with the 
rough opening before proceeding.

C. 

Cut the water resistive barrier 

(1C).

Note: Additional cutting patterns are shown on the last page of this instruction.

D. 

Fold the water resistive barrier 

(1D). Fold the side flaps into the opening and staple 

to inside wall. Fold top flap up and temporarily fasten with flashing tape.

*OUFSJPS

#

*OUFSJPS

"

UIDVU
.BLFBDVUVQGSPN
FBDIUPQDPSOFSBUB¡
BOHMFUPBMMPXUIFXBUFS
SFTJTUJWFCBSSJFSUPCF
MBQQFEPWFSUIFmOBUUIF
IFBEPGUIFXJOEPX

TUDVU

OEDVU

SEDVU

8BUFS3FTJTUJWF#BSSJFS

UIDVU
$VUEPXO NVTUCF
BCPWFUIFUBMMFTUQPJOU
PGUIFPQFOJOHUPNFFU
UIF¡DVUPO
FBDIDPSOFS

$

&YUFSJPS

%

Содержание 80GZ0102

Страница 1: ...ting an experienced architect contractor or structural engineer prior to installation of Pella products The individual building owner architect contractor installer and or consumer responsible for the...

Страница 2: ...E APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT B Verify the window will t the opening Measure all four sides of the opening to MAKE SURE IT IS LARGER THAN THE WINDOW in both width and height On larger op...

Страница 3: ...G from each side Spacers are also required at points where windows are joined in multiple window applications Add shims as necessary to ensure the spacers are level Once level attach spacers and shims...

Страница 4: ...each installation screw hole Adjust the shims as required to plumb and square the window in the opening Note DO NOT over shim C Check the interior reveal Make sure the measurement from the interior fa...

Страница 5: ...dow Position the tape so it laps ONTO THE FRAME CLADDING COVERS THE lN AND LAPS ONTO THE WATER RESISTIVE BARRIER 4HE TAPE SHOULD EXTEND ABOVE THE TOP OF THE WINDOW AND BELOW THE BOTTOM OF THE WINDOW 0...

Страница 6: ...al cuts in the water resistive barrier Apply the tape covering the entire diagonal cut in the resistive water barrier at both upper corners of the window Note Be sure to overlap the top corners 4E 5 S...

Страница 7: ...PG DDFTTPSZ SPPWF DDFTTPSZ SPPWF OTVMBUJOH GPBN JO 7 45 4 JO MFBSBODF BDLFS 3PE BOE 4FBMBOU UZQJDBM OTVMBUJOH GPBN 1FSJNFUFS 4FBMBOU NVTU FYUFOE UP SPPNTJEF PG DDFTTPSZ SPPWF DDFTTPSZ SPPWF 7 INTERIO...

Страница 8: ...e the sash to stick it is optional to paint stain or nish the HORIZONTAL SASH EDGES s N PATIO DOORS IT IS OPTIONAL TO PAINT STAIN OR lNISH THE VERTICAL AND HORIZONTAL PANEL EDGES Note To maintain prop...

Страница 9: ...lla products as well as the design and installation of ashing and sealing systems are the responsibility of the Buyer or User the architect contractor installer or other construction professional and...

Отзывы: