APPLYING INSTALLATION FINS

A. 

Cut the fins to length.

 Using the following 

formula, cut the fins to length, making sure 
the end cut is square on both ends.

Heads and Sills:  

Length = Frame width + 2-1/2"

Jambs:

  Length = Frame 2-1/2"

Jambs, if there is no fin at the sill:

  Length = Frame 1-1/4"

Combinations:

  Length = Combination 2-1/2"

B. 

Notch the ends of the fins.

 Measure and 

mark 1-7/16" from each end of the fins. Using 
a hacksaw, cut the fin receptor leg at the mark. 
Finish removing the bottom receptor legs by 
scoring the fin with a utility knife and snapping it 
off the fin.

Note: When using fins on all four sides, all ends 
must be notched. If no fin is used at the sill, DO NOT 
notch the bottom of the jamb fins.

'SBNFSFDFQUPSMFH

#

C. 

Install the two side fins

 into the top of the frame 

jamb grooves located on the side frame members 
of the door. Slide the fins into place.

Note: Spray a solution of water and soap on the 
frame jamb grooves to reduce sliding friction.

D. 

Install and slide the top fin

 into the frame 

head groove located in the top frame member.

Note: The top fin must overlap the exterior 
of the side fins.

'SBNFKBNCHS

PPWF

$

$

'SBNFIFBEHS

PPWF

%

$VUUPMFOHUIVTJOH

HJWFOGPSNVMB

"

E. 

Apply a bead of sealant where the fins overlap.

 Pump extra 

sealant into the cavity created by the two overlapping fins.

4*%&7*&8

 3FHVMBS'JO

*OTUBMMBUJPO

mO

'SBNF

HSPPWF

%

*OTUBMMBUJPO

mO

4*%&7*&8

 0GGTFU'JO

'SBNF

HSPPWF

%

1VNQFYUSB

TFBMBOUIFSF

&

F. 

When applying fins to mulled products, place a line of 
sealant

 from the exterior face of the fin to the exterior of the 

door frame at the mullion joint.

B

D

E

A

C

C

D

D

Содержание 803V0102

Страница 1: ...e instructions and additional care Determining the appropriate installation method is the responsibility of you your architect or construction professional Sill Flashing Tape 2 Sill Flashing Tape 1 Water Resistive Barrier Sheathing Framing Nailing Fin Sill Support Top Flashing Tape Fin Corner Door Top Door Bottom Side Flashing Tape Interlocker Side Flashing Tape Corner Flashing Tape Corner Flashin...

Страница 2: ...ealant gun Ř Scissors or Utility knife Ř Screwdrivers Ř 2 Phillips with 8 shaft and small flat blade Ř Rubber mallet Ř Drill Installation will require two or more persons for safety reasons 4 5 4 5 A Confirm the opening is plumb and level Ensure the bottom of the rough opening does not slope towards the interior Note It is critical the bottom is level OUFSJPS OUFSJPS 4th cut Make a 6 cut up from eac...

Страница 3: ...ng to the exterior of the sill structure to support the edge of the door sill The sill support should be cut the entire length of the sill member and placed flush with the subfloor A Remove the plastic wrap and cardboard packaging from the door Note If screens or hardware are removed from the door at this time label them and store them in a protected area B OX XO doors only Remove the shipping space...

Страница 4: ... end of the top nailing fin see inset These are used to hold the door in place while shimming it plumb and square C Plumb and square door Insert shims as necessary between the door and the sides of the rough opening starting up 6 from the bottom of the door Keep shims back 1 2 from interior face of window Note DO NOT shim above the door DO NOT OVER SHIM Interior 3C JYFE 1BOFM 1SF ESJMMFE QBOFM SFUB...

Страница 5: ... overlap the top corners YUFSJPS YUFSJPS YUFSJPS F Doors with vertical mullions only Fasten the door sill to the rough opening sill using one of the following screw types and locations a Doors using aluminum sill support Drill a 5 32 diameter hole 1 from each of the mulled door jambs through the door sill and the aluminum sill support Place a bead of sealant in each hole and install a 10 x 3 4 sel...

Страница 6: ...t operate correctly check to make sure it is still plumb level square and that the sides are not bowed If adjustments are required remove the foam with a serrated knife Adjust the shims and reapply the insulating foam sealant Note If the optional Patio Door High Performance Panel Retainer was ordered with the sliding door install the high performance roller retainer before installing the vent pane...

Страница 7: ...ng building components and priming requirements C Shape tool and clean excess sealant When finished the sealant should be the shape of an hourglass Note This method creates a more flexible sealant line capable of expanding and contracting When applying siding brick veneer or other exterior finish material leave adequate space between the door frame and the material for sealant Refer to the illustrati...

Страница 8: ...et may be used to drive the I bar joining connector into position If necessary the I bar joining connector can be cut in half and driven from each end E Apply sealant to the ends of the mullion joint The bead of sealant should extend from the center of the mullion joint to the exterior of the unit covering the foam plug A Align foot bolt to the strike then tighten the exposed screw B Slide the foo...

Страница 9: ...te A rubber mallet may be used to drive the I bar joining connector into position F Apply a bead of sealant covering the mullion joint from the center of the I bar joining connector to the exterior G Apply a reinforcement plate at the head using the square notches to align the plate to the head frame screws in the 1 1 2 wide flat groove to the interior side of the frame H Secure the plate with 8 x ...

Страница 10: ...om of the jamb fins SBNF SFDFQUPS MFH C Install the two side fins into the top of the frame jamb grooves located on the side frame members of the door Slide the fins into place Note Spray a solution of water and soap on the frame jamb grooves to reduce sliding friction D Install and slide the top fin into the frame head groove located in the top frame member Note The top fin must overlap the exter...

Страница 11: ...cted to properly manage moisture Pella Corporation is not responsible for claims or damages caused by anticipated and unanticipated water infiltration deficiencies in building design construction and maintenance failure to install Pella products in accordance with Pella installation instructions or the use of Pella products in wall systems which do not allow for proper management of moisture within ...

Страница 12: ...This page left blank intentionally ...

Отзывы: