background image

Interior

2E

2E

1

2 0 3 0

4 0 5 0

6 0 7 0

2

3

INCHES

mm

2F

3

 

INTEGRATING THE WINDOW TO 

  THE WATER RESISTIVE BARRIER

A. 

Apply side flashing tape

#UTTWOPIECESOFmASHINGTAPELONGER

THANTHEFRAMEHEIGHTOFTHEWINDOW!PPLYONEPIECETOEACHSIDE

ONTOTHEFRAMECLADDINGOVERTHENAILINGlNANDONTOTHEWATERRESISTIVE

BARRIER4HETAPESHOULDEXTEND

"

 above the top of the window and 

BELOWTHEBOTTOMOFTHEWINDOW0RESSTHETAPEDOWNlRMLYWHILE

FOLDINGDOWNTHEEXCESSTAPEATTHETOPANDBOTTOMOFTHEWINDOW

2

 SETTING AND FASTENING THE WINDOW (CONTINUED)

2H

Note: The flashing tape must be applied approximately 1/2" 
onto the frame cladding at the jambs and head. Pre-folding the 
tape at 1/2" before removing the paper backing will make it 
easier to apply the tape correctly. If the siding is less than 1/2" 
thick, adjust the dimension of the fold so the exterior sealant 
line will cover the exterior edge of the tape.

E. 

Plumb and square window

0LACESHIMSFROM

the bottom and top of the window between the 
window and the sides of the opening. Adjust 
the shims as required to plumb and square the 
window in the opening. If the frame height 

EXCEEDSPLACESHIMSATTHEMIDPOINTOFTHE

window sides.

Note: Do not shim above the window or in the 
space between the spacers at the bottom of the 
window. DO NOT over shim.

F. 

Check the interior reveal

. Make sure the measurement from the interior 

face of the window to the interior face of the wall is equal at several 
points around the window.

Note: If the dimensions are not equal, check to make sure the fins are 
folded out to 90° at all points.

'

Check window operation

VENTUNITSONLY 5NLOCKTHEWINDOWBY

lifting the lock handle up. Open the window by rotating the crank 
handle. Remove the shipping spacers. Open and close the window a few 
times to check for proper operation. Close and lock the window.

Note: If there are any problems with the operation of the window, 
recheck shim locations and adjust for plumb and square.

(

Fasten the window to opening

BYDRIVINGGALVANIZEDROOlNG

NAILSINTOEACHPREPUNCHEDHOLEINTHENAILINGlN

Note: Make sure the fin corner is lying as flat as possible.

Î

Содержание 801P0101

Страница 1: ...ue to your project may require an installation method different from these instructions and additional care Determining the appropriate installation method is the responsibility of you your architect...

Страница 2: ...1 ROUGH OPENING PREPARATION A Verify the opening is plumb and level Note It is critical that the bottom is level B Verify the window will t the opening Measure all four sides of the opening to make S...

Страница 3: ...grilles or hardware are removed from the window at this time label them and store them in a protected area 1 ROUGH OPENING PREPARATION CONTINUED F Tab the sill ashing tape and fold UT WIDE TABS AT EAC...

Страница 4: ...bottom and top of the window between the window and the sides of the opening Adjust the shims as required to plumb and square the window in the opening If the frame height EXCEEDS PLACE SHIMS AT THE...

Страница 5: ...ration VENT UNITS ONLY BY OPENING AND CLOSING the window Note If the window does not operate correctly check to make sure it is still plumb level square and that the sides are not bowed If adjustments...

Страница 6: ...Perimeter Sealant must extend to room side of Accessory Groove Accessory Groove Sealant typical 3 8 Min 3 8 BRICK VENEER 3 8 Clearance Backer Rod and Sealant typical Perimeter Sealant must extend to...

Страница 7: ...use tools that might damage the surface 5SE OF INAPPROPRIATE lNISHES SOLVENTS BRICKWASH OR CLEANING CHEMICALS WILL CAUSE ADVERSE reactions with window and door materials and voids the Limited Warrant...

Страница 8: ...NAL INSTALLATION FOLD THE CRANK OVER AND snap the knob into the pocket Note Even with the window open the crank can be folded to avoid interfering with the window treatments Crank Handle C D Operator...

Отзывы: