GB 25
INSTALLATION
• 3-phase connection (3L, 230 V ~ / 50 Hz):
▷
The voltage between the phase and the zero is 230 V ~. Fit a
connecting bridge between the connection points 4-5. Your
groups must be fused with at least 16 A (3x). The core diameter
of the connecting cable must be at least 2.5 mm
2
.
The bridges on the connecting block can be used to create the required
connections, as indicated in these illustrations.
Fix the cable with a pull relief and close the cover.
Connection point, wall-mounting socket and plug must be accessible
at all times.