22
Home
16-06-07 10:12:17
Power
Today
Total
kWh
kWh
2.28
2.28
kWh
2.5
5,41 kW
5,36
5,36
kW
kW
Normal
49,98 Hz
S/N:
Master DSP SW:
HCI MCU SW:
After connecting to AC and DC
power the inverter presents the
screen on the left.
• Press OK to start
commissioning.
• Select the language.
• Press OK to confirm.
• Select the country.
• Press OK to confirm.
YYYY
Left/Right: Move selection
Up/Down: Increase/Decrease Value
End Commissioning
14-01-15 10:12:17
Date/Time
- - -
• Specify Date and Time.
• Press OK to confirm.
End of Commissioning:
• Press OK to confirm.
The inverter performs self-tests
and checks the AC-grid.
The inverter starts operation after
a few minutes.
987654000
V1.83
V1.10
Slave DSP SW:
V1.83
English
Geman
French
Italian
Chinese
Language
Press OK to confirm.
Press OK to start.
Country
MM
DD
2 0 1 6 -
0 6 - 0 7
hh mm
0 0 : 0 0
Press OK to confirm.
Press OK to confirm.
Press OK to start running
Press ESC to Return
EN
Commissioning
<ESC> to Main Menu
GR - Islands
GR - Continent
NL - EN 50438
Current Country:
DE - VDE 4105
Press OK to confirm
Current Country:
DE - VDE 4105
Spanish
DE - VDE 4105
IT - CEI 0-21
AU - AS 4777
ES - RD 1699
CZ - EN 50438
Содержание PSI-10000TL
Страница 1: ...1 PSI 5500TL PSI 7000TL PSI 8500TL PSI 10000TL EN IT TRIPHASE INVERTER INVERTER TRIFASE ...
Страница 2: ...2 ...
Страница 18: ...16 ...
Страница 31: ...29 ...
Страница 34: ...PSI 5_5 10_0KTL IG_10_IT Art No 614 03101 00 ...