PeerlessBoilers WV-DV Series Скачать руководство пользователя страница 5

 A.  ACCESSIBILITY CLEARANCES

To provide for reasonable conditions of accessibility, 

the following minimum clearances are recommended: 

Alcove Installation.

1.  12” from left side
2.  24” from top
3.  24” from front
4.  9” from right side and rear

 B.  CLEARANCES FROM COMBUSTIBLE

 CONSTRUCTION

The design of this boiler is certified for the following 

clearances from combustible construction:

1.  0” from rear
2.  0” from right and left sides
3.  0” from top

4.  0” from vent pipe
5.  0” from vent connector
6.  0” from vent terminal
7.  24” from front

 C.  BOILER WATER TREATMENT

Consult a local qualified water treatment specialist for 

recommendations regarding the appropriate chemical 

compounds and concentrations which are compatible 

with local environmental regulations.

1.  Boiler water pH should be in the 7.5 to 11 range.
2.  Boiler water chloride concentration should  

 

be less than 30 ppm.

3.  The water hardness should be less than 9 grains per  

 

gallon to prevent scale build-up.

3

PREINSTALLATION

 1. PREINSTALLATION

In accordance with Section 325 (f) (3) of the Energy Policy and Conservation Act, this boiler is equipped with a 

feature that saves energy by reducing the boiler water temperature as the heating load decreases. This feature 

is equipped with an override which is provided primarily to permit the use of an external energy management 

system that serves the same function. 
THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE: 

•   An external energy management system is installed that reduces the boiler water temperature as the 

heating load decreases.

•  This boiler is not used for any space heating.
•   This boiler is part of a modular or multiple boiler system having a total input of 300,000  

BTU/hr or greater. 

•  This boiler is equipped with a tankless coil.

NOTICE

Never burn garbage or paper in the unit, and never 

leave combustible material around it.

CAUTION

Do not tamper with boiler or controls.

CAUTION

Do not use this appliance if any part has been under 

water. Improper or dangerous operation may result. 

Immediately call a qualified service technician to 

inspect the boiler and to replace any part of the 

control system and any control which has been 

under water.

WARNING

Read carefully, study these instructions before beginning work. It will save time. Study the included drawings. Save these 

instructions for reference.
The boiler warranty can be voided if the boiler is not installed, maintained and serviced correctly.

This manual is intended for use by Qualified Heating Professionals only.  Installation, service, or adjustment 

of this heating appliance by anyone other than a Qualified Heating Professional can cause significant property 

damage, personal injury, or death.

WARNING

The equipment shall be installed in accordance with those installation regulations in force in the local area 

where the installation is to be made, including the current edition of 

NFPA-31, Standard for the Installation of 

Oil-Burning Equipment

, and in 

Canada, CSA B139, Installation Code for Oil Burner Equipment

. These shall be 

carefully followed in all cases. Authorities having jurisdiction shall be consulted before installations are made.

NOTICE

Содержание WV-DV Series

Страница 1: ...WV DV Boilers Series Oil Installation Operation Maintenance Manual...

Страница 2: ...inter months as well as shorten the life of the deck materials Refer to Chapter 4 in this manual for specific terminal location requirements Condensate from a side wall vent terminal may also cause pa...

Страница 3: ...ILER 4 3 PIPING CONTROLS 5 A BOILER SUPPLY RETURN 5 B SAFETY RELIEF VALVE 5 C TANKLESS WATER HEATER 5 D INDIRECT FIRED WATER HEATER 6 E CONTROLS 6 4 VENTING 7 A VENT SYSTEM INSTALLATION 7 5 BURNER SET...

Страница 4: ...instructions and make special notice of potential hazards These categories mean in the judgment of PB Heat LLC USING THIS MANUAL USING THIS MANUAL Indicates a hazardous situation which if not avoided...

Страница 5: ...em is installed that reduces the boiler water temperature as the heating load decreases This boiler is not used for any space heating This boiler is part of a modular or multiple boiler system having...

Страница 6: ...This boiler is suitable for use on combustible flooring provided the boiler is not set on carpet and a metal drip pan is placed under the appliance 4 See clearance information in Section 1 Preinstall...

Страница 7: ...er from condensation Condensation will damage the boiler and will lead to shortened boiler life and maintenance problems 9 If the boiler is to be used in conjunction with a refrigeration system the ch...

Страница 8: ...ure 3 4 PIPING CONTROLS IMPORTANT In accordance with Section 325 f 3 of the Energy Policy and Conservation Act water boilers are equipped with a feature that saves energy by reducing the boiler water...

Страница 9: ...ly maintained f If the boiler is used to heat potable tap water the boiler will operate year round The effects of hot gases and odors must be taken into consideration during the summer months g See Fi...

Страница 10: ...nside 2 Use Z Flex 4 diameter Vent Pipe 3 For air intake use 4 diameter galvanized smoke pipe or 4 diameter flexible corrugated aluminum pipe Maximum equivalent length of galvanized smoke pipe is 40 A...

Страница 11: ...circuit board inside burner cover Post purge duration must be a minimum of one minute Adjust dial so arrow is pointing directly to the right toward mounting screw for AL1009 bracket Check post purge...

Страница 12: ...y require the addition of a backflow preventer or manual fill only with separation from the city water supply d Consider the minimum temperature of potential exposure in the system when deciding on th...

Страница 13: ...65 1 3 3 WV DV 04 115 Hago 85 60 B or Delavan 85 60 W 180 2 5 0 WV DV 04 130 Hago 1 10 60 B or Delavan 1 10 60 W 140 4 5 0 Start up and adjustment recommendations Above Turbulator Pin Air Damper and A...

Страница 14: ...National Electrical Code and Local Requirements Single Pole Switches including those of Safety Controls or Protective Devices shall not be wired in a grounded line 6 ELECTRICAL Do not connect power su...

Страница 15: ...13 ELECTRICAL Figure 6 2 Hydrolevel 3250 Limit Control Riello Burner...

Страница 16: ...es become airborne during service or repair inhalation of these particles may be hazardous to your health Avoid Breathing Fiber Particulates and Dust Suppliers of RCF recommend the following precautio...

Страница 17: ...ust be taken not to damage this material during cleaning 4 Remove any scale or soot from the combustion chamber area by vacuum cleaning or any other available means 5 Replace oil burner and flue colle...

Страница 18: ...NTENANCE 2 Be certain that the boiler and system are refilled before returning to service Always keep the manual fuel supply valve shut off if the burner is shut down for an extended period of time CA...

Страница 19: ...unusual piping and pickup requirements such as intermittent system operation extensive piping systems etc 4 Heating Capacity and Annual Fuel Utilization Efficiency AFUE ratings are based on U S Gover...

Страница 20: ...ir Parts Repair parts are available from your local PB Heat LLC distributor or from Parts To Your Door at 1 610 916 5380 www partstoyourdoor com Note Remember to include the boiler model number and se...

Страница 21: ...lue Collector Plate Blanket Seal 1 90999 90999 11 Flue Collector Cover Plate 1 50245 50245 12 Rope Seal 2 ft 51209 51209 13 Rear Outlet Cover Plate 1 90563 90563 15 Jacket Assembly 1 90098 90418 Limit...

Страница 22: ...20 NOTES...

Страница 23: ...ation Operation Maintenance Manual TO THE INSTALLER This manual is the property of the owner and must be affixed near the boiler for future reference TO THE OWNER This boiler should be inspected annua...

Отзывы: