58
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check and adjust the platform as necessary to insure level lifting.
3. Check all fastener and re-torque.
For Secondly Cylinder
Fig.53
For shaft of piston rod of
Secondly cylinder
Fig.54
31
Содержание AMGO PX12
Страница 1: ...PX12 PX12A X550 X550A...
Страница 25: ...50 IV EXPLODED VIEW MODEL PX12A X550A Optional Turnplate Fig 40 95 23...
Страница 26: ...51 MODEL PX12 X550 Fig 41 24...
Страница 27: ...52 CYLINDERS Fig 42 Add grease to lubricate regularly Add grease to lubricate regularly 25...
Страница 28: ...53 CONTROL CABINET Fig 43 26...
Страница 29: ...54 PEAK ELECTRIC POWER UNIT 220V 50HZ 1Phase 380V 50HZ 3 Phase Fig 44 27...
Страница 41: ...72115304 01 2017...