44
E. Level two platforms and install anchor bolts.
1. Check by level bar, adjust the down leveling bolts(
see fig.32B
) and add the shim
until two platforms are in the same level, lowering the lift to the lowest position and
adjust the up leveling bolts (
see fig.32A
) until contacting the down leveling bolts,
tighten the nut with wrench.
2. Install anchor bolts.
2.1 Raise the lift to 1000mm then drill holes to install the anchor bolts
(
See Fig.33
).
2.2 Fix the anchor bolts.
Drilling the hole for the anchor bolt with the rotary hammer drill, type the anchor
bolt into the ground, and then fasten it with ratchet spanner
(See Fig. 34).
Note: The twisting force of anchor bolt is 150N.m, the length inside ground of
anchor bolt must be over 90mm.
Using the anchor bolt
to fix the machine
10
00
m
Fig. 33
Drilling
Clearing
Bolting
Tighten
87A/87B
Fig. 34
PI
PII
PI
PII
49
For the lifts
:
use
19 driller
to drill hole
For the control
cabinet
:
use
10 driller to
drill hole
Using the anchor
bolt to fix the
control cabinet
50
90
m
m
level bar
Down leveling bolts
Tighten the nut
Up leveling
bolts
Tighten the
nut
Fig.32B
17
Содержание AMGO PX12
Страница 1: ...PX12 PX12A X550 X550A...
Страница 25: ...50 IV EXPLODED VIEW MODEL PX12A X550A Optional Turnplate Fig 40 95 23...
Страница 26: ...51 MODEL PX12 X550 Fig 41 24...
Страница 27: ...52 CYLINDERS Fig 42 Add grease to lubricate regularly Add grease to lubricate regularly 25...
Страница 28: ...53 CONTROL CABINET Fig 43 26...
Страница 29: ...54 PEAK ELECTRIC POWER UNIT 220V 50HZ 1Phase 380V 50HZ 3 Phase Fig 44 27...
Страница 41: ...72115304 01 2017...