55
V
.
TEST RUN
1. Fill oil adjustment
a. Turn on the power after connecting oil system correctly. Press the button
Up
, and
check the rotated direction of the motor (This is right if lift is upward, otherwise, it is
wrong direction of the motor). Shut off power and exchange the phase connection if
the direction is wrong.
b. Fill the reservoir with hydraulic oil. In consideration of power unit’s durability and
keep the equipment running in the perfect condition,
please use Hydraulic Oil
46#.
c. Lower the platforms to the lowest position.
2. Synchronous adjustment
a. Turn the handles of the shutoff valves to the position as
Fig. 46
(Normal working
position), push button
“UP”
until both platforms up to the position that the high limit
switch and stopped, at this time, push button “
UP”
and the red button beside the oil
water separator at the same time to raise the lift to the highest position
(See Fig.45)
.
b. Turn the handles of the both shutoff valves to the oil filling position show as
Fig.47
Red button (SB)
Fig. 45
Fig. 46
Fig. 47
Normal Working Position
Oil Filling Position
28
Содержание AMGO PX12
Страница 1: ...PX12 PX12A X550 X550A...
Страница 25: ...50 IV EXPLODED VIEW MODEL PX12A X550A Optional Turnplate Fig 40 95 23...
Страница 26: ...51 MODEL PX12 X550 Fig 41 24...
Страница 27: ...52 CYLINDERS Fig 42 Add grease to lubricate regularly Add grease to lubricate regularly 25...
Страница 28: ...53 CONTROL CABINET Fig 43 26...
Страница 29: ...54 PEAK ELECTRIC POWER UNIT 220V 50HZ 1Phase 380V 50HZ 3 Phase Fig 44 27...
Страница 41: ...72115304 01 2017...