background image

Page 7

Environmental Declaration

We   

 

Peak Scientific Instruments Ltd.

Of 

 

 

Fountain Crescent, Inchinnan, Renfrewshire, PA4 9RE

Declare that:

 

Equipment:  

Nitrogen Gas Generator

 

Models: 

 

Genius XE QSD

Is fully compliant with the following Directives.

•  2012/19/EU 

 

 

WEEE (Waste of Electrical and Electronic Equipment)

•  2011/65/EU & 2015/863 

RoHS  (Restriction of Hazardous Substance)

Peak Scientific Instruments Ltd fully complies with its obligations towards the European 

WEEE (Waste of Electrical and Electronic Equipment) Directive 2012/19/EU. These 

obligations are being met within the B2B compliance group.

Peak Scientific Instruments Ltd, herewith confirm that as a manufacturer of articles we 

conform to the European Parliament and Council Directives, 2011/65/EU for the original 

6 restricted substances listed in the Restriction of Hazardous Substances (RoHS) 

Directive and Commision Delegated Directive (EU) 2015/863 to include 4 additional 

restricted substances. Peak Scientific Instruments LTD have developed all reasonable 

'due diligence' controls to ensure that our products comply with the principles and 

requirements of the RoHS (Restriction of Hazardous Substances) Directives.

Where a specific certificate of compliance is required, this can be requested, on 

a product serial number basis, directly from Peak Scientific Instruments Ltd, by 

contacting us through our website at 

www.peakscientific.com

Signed: 

   Name: Chris 

Pugh

Date: 

 25/02/2019 

 Position: 

Engineering 

Director

Содержание Genius XE QSD

Страница 1: ...Genius XE QSD User Manual Rev 4 RSID 3490 EN 03 03 20 Genius XE QSD User Manual...

Страница 2: ...Environment 11 Generator Overview 12 General Dimensions 12 Genius XE QSD Rear Connections 13 Unit Controls 13 Drain Connection 14 Electrical Connection 15 Start Up Sequence 16 Connecting to the applic...

Страница 3: ...a reference document where you can skip to the relevant information Users can refer to the contents page to find the relevant information Please review each of the following sections carefully Thank...

Страница 4: ...ality of the foregoing that any defect is not the direct or indirect result of lack of repair and or servicing incorrect repair and or servicing use of wrong materials and or incorrect spare parts 2 A...

Страница 5: ...ted conditions are fully understood or met A CAUTION notice denotes a hazard It calls attention to an operating procedure process or similar which if not correctly performed or adhered to could cause...

Страница 6: ...nts for Electrical Equipment for Measurement Control and Laboratory Use Electromagnetic Compatibility Directive 2014 30 EU EN 61326 1 2013 Electrical Equipment for Measurement Control and Laboratory U...

Страница 7: ...th confirm that as a manufacturer of articles we conform to the European Parliament and Council Directives 2011 65 EU for the original 6 restricted substances listed in the Restriction of Hazardous Su...

Страница 8: ...f 3 hours before operation Generator Outlets Nitrogen Maximum Flow 16L min 5 52bar 0 57cfm 80psi Air Maximum Flow 67L min 7 58bar 2 37cfm 110psi Particles 0 01 m Phthalates NONE Suspended Liquids NONE...

Страница 9: ...e Peak Partner from where the unit was purchased Follow the unpacking instructions posted on the side of the crate It will require two people to remove the unit from the shipping crate and to manoeuvr...

Страница 10: ...gs Kit are as follows 1 Teflon Tubing x 3m x 3 2 6mm PE Tubing x 3m x 1 3 Compression Fitting x 3 4 6mm Push Fit Fitting x 1 5 Flow Control Silencer x 3 6 UK Mains Power Cable 230v x 1 7 EU Mains Powe...

Страница 11: ...ts These can sometimes give rise to pockets of air with high relative humidity Operation of the unit within such a pocket could adversely affect its performance Consideration should also be given to t...

Страница 12: ...2 Generator Overview General Dimensions The generator must always be placed on a flat level surface Failure to do so will affect the performance of the generator WARNING 570 mm 22 4 897 mm 35 3 700 mm...

Страница 13: ...and applications All Connections should only be carried out by trained personnel Generator must be switched off and unplugged prior to any cleaning or maintenance operations Unit Controls IEC Power I...

Страница 14: ...tubing to connect this to a suitable drain connection or container It should be noted that the Generator can expel a considerable amount of water from this dependant on ambient humidity If a containe...

Страница 15: ...nerator or risk overloading of the power cord This unit is classified as SAFETY CLASS 1 THIS UNIT MUST BE EARTHED Before connecting the unit to the mains supply please check the information on the ser...

Страница 16: ...is reached the compressors will continue to run until the internal tank upper pressure limit is reached and the compressor has run for a period of at least two minutes The compressors will then rest u...

Страница 17: ...leak in the gas supply between the generator and the application can lead to a reduction in efficiency Tubing Lengths The diameter of the tubing which will be connected to the gas outlets is importan...

Страница 18: ...erator is designed to operate in either a cyclic mode or run continuously this will be dependent on the output flow The cyclic rate of the compressors will depend on the gas demand of the application...

Страница 19: ...nths Genius XE QSD Annual Maintenance Kit www peakscientific com ordering 4 Years Genius XE QSD Year 4 Service Kit www peakscientific com ordering Please quote your generator serial number when orderi...

Страница 20: ...the LED on Stage 2 If the service is not completed the generator will continue to run After 2 weeks the service LED indicator yellow will start to flash This is to make the user aware that the service...

Страница 21: ...to install and setup your generator IQ OQ Certified assurance for applications requiring documented qualification Complete plan Swift response by a Peak Service Engineer within 72 hours planned preve...

Страница 22: ...e cloth prior to use Cleaning should only be undertaken with the power switched off and the power cord removed from the rear of the generator Under no circumstances should any solvents or abrasive cle...

Страница 23: ...ice provider The mass spec is reporting low pressure Contact your service provider Yellow SERVICE LED on front panel is on constantly A compressor s due for service Contact your service provider Refer...

Страница 24: ...ic com For generators that remain unregistered after 1 month from the shipment date the warranty will be considered active from the date of factory dispatch Complete Plan only Go Online or Complete an...

Страница 25: ...Page 25...

Страница 26: ...Page 26...

Страница 27: ...ustry leading rapid response service to our customers With Peak Protected your laboratory s productivity becomes our top priority To discuss Peak Protected generator cover and payment options speak to...

Отзывы: