background image

 

 

 

 

PowerWave 2

TM 

Bus System

 

250-800A

 

Branch Circuit Monitoring System 
Setup and Operation 

 

 

Ctrl Nr: PM375107 

Revision: 002 

 

 

 

Содержание PowerWave 2 Busway

Страница 1: ...PowerWave 2TM Bus System 250 800A Branch Circuit Monitoring System Setup and Operation Ctrl Nr PM375107 Revision 002...

Страница 2: ...com PowerWave 2 Bus System 250 800A Branch Circuit Monitoring System Setup and Operation Control Number PM375107 Rev 002 2017 by Power Distribution Inc All rights reserved Release date November 2017...

Страница 3: ...us Run 18 3 4 2 Updating Setup Information 18 3 5 Setup Tab Identifying Devices on a Bus Run 18 3 5 1 Addressing on a Bus 18 3 5 2 Setup Device Designations 18 3 6 Setup Tab Manipulating the Device Li...

Страница 4: ...3 1 Login 31 4 3 2 Setup Screen Buttons 31 4 3 3 Setting Parameters for Upstream Modbus TCP IP 32 4 4 Modbus Addresses with Local Display 33 4 5 Operational Use of the Local Display 35 4 5 1 System Vi...

Страница 5: ...d Changing Specific Point Values 24 Figure 16 Setup Data Tab Setting Option Register Values 25 Figure 17 Setup Data Tab Saving or Rejecting Point Changes 25 Figure 18 7 in Local Display with Six Bus R...

Страница 6: ...owerWave 2 Bus System components including the Branch Circuit Monitoring System Use a properly rated voltage sensing device to confirm power is OFF However Tap Off Boxes can be inserted into an operat...

Страница 7: ...ny one of three upstream protocols mutually exclusive options o Modbus RTU standard at 9600 or 19200 bps 4 wire or 2 wire o Modbus TCP IP with a front end protocol converter o Simple Network Managemen...

Страница 8: ...CMS Setup and Operation Cntl Nr PM375107 002 8 An optional TCP IP protocol converter can be installed on the upstream side of the 7 Local Display Chapter 4 in this manual describes setup and operation...

Страница 9: ...ol converter is installed for SNMP o 2 ports if a protocol converter is installed for Modbus TCP IP 1 USB port for connecting a PC to perform BCMS Setup With input power source monitoring 3 fuses are...

Страница 10: ...x The Accumulator PCB is in the bottom right corner of the Comm Box Note If Modbus TCP IP or SNMP is a selected option a protocol converter is installed as shown When either option is selected you can...

Страница 11: ...often desirable to daisy chain a cluster of nearby power feeds to consolidate data presentation onto a single uplink Power feeds can be daisy chained using Modbus RTU or Modbus TCP IP All power feeds...

Страница 12: ...ox BCMS see Figure 4 See PowerWave 2 Bus System 250A 800A Installation and Operation PM375106 for instructions on inserting Tap Off Boxes into a Bus Rail To connect the Tap Off Box to the Communicatio...

Страница 13: ...p Off Box Bus Rail has Modbus connections for Tap Off Boxes every 13 Tap Off Boxes with Universal U Channel and legacy Tap Off Boxes connect to the monitoring cable with the same monitoring cable Lega...

Страница 14: ...will need the following as prerequisites a A PC with Microsoft Windows installed b 1 Male A to Male B USB cable sufficient to reach from your PC to the Comm Box on the Power Feed enclosure c Setup so...

Страница 15: ...tion page you may not have the USB FTDI drivers installed and recognized by Windows iii If the message No Accumulator found on USB appears at the top of the page you may have disconnected the USB cabl...

Страница 16: ...ower source There is only be one of these PCBs b Tap Off Box IBUS iBus PCB This PCB is in the Tap Off Box and monitors up to 6 poles c The Number of Devices INP PM IBUS counts or 0 input power source...

Страница 17: ...eam network using boxes in the top row of the Setup tab a The Modbus Base Address is assigned to the first device in the device list Other device addresses increment up from this address b Set network...

Страница 18: ...rder of devices on a bus does not identify them The communication connections along the Bus Rail simply provide a connection into the bus they are of no importance in assigning addresses A device is i...

Страница 19: ...dresses one by one in sequence 3 6 1 Add Remove or Swap Devices Use the buttons on the right side of the Setup Tab screen to add substitute swap or remove devices from the Modbus address list No Devic...

Страница 20: ...meters you can set parameters for individual Tap Off Boxes using the Data Tab see section 3 8 Data Tab 3 7 1 Set Electrical Characteristics for All Tap Off Boxes Set Voltage Type Click the drop down b...

Страница 21: ...KWH accumulations during setup Clear Alarms Clear Min Max sets the minimum and maximum current measurements to the most recent current measurement value Clear KWH sets KWH accumulation to 0 You should...

Страница 22: ...st which can be displayed and modified in the Data Tab The Data Tab lets you display and change data for each point or Modbus register in a specific points list How to change a point or Modbus registe...

Страница 23: ...BCMS Setup Accumulator Application Cntl Nr PM375107 002 23 Figure 13 Setup Data Tab Basic Operations 1 Select Data Tab 2 Select Device 3 Select Point 4 Modify Point Data 5 Save Changes...

Страница 24: ...b screen Figure 15 Figure 15 Setup Data Tab Selecting and Changing Specific Point Values 1 Use drop down box to select device The first device is usually the INP PM Input Power Monitor for monitoring...

Страница 25: ...ting Point Changes 1 Click an option register button to display its point values 2 Option registers are bit oriented Check the option values you want They will be written to the Write to Modbus data f...

Страница 26: ...wer feeds are designated end feeds in this application End feed is used for both Standard End Feed and Center Feed The Local Display can pass monitoring data through to the Building Management System...

Страница 27: ...face Board and to the base of the Local Display 4 1 1 Mounting and Opening Enclosure See Figure 19 1 The 7 Local Display can be wall mounted 2 Remove the Philips retaining screw on the left side of th...

Страница 28: ...erface Board 4 1 3 Modbus Network Connections Modbus RTU connections are also made to the Display Interface Board Figure 21 Upstream Modbus connection is to Modbus master device such as a BMS or DCIM...

Страница 29: ...a front end protocol converter The Ethernet connection is made directly to the Local Display Figure 22 Connections downstream of the Display to the bus runs remain Modbus RTU connections Figure 22 Loc...

Страница 30: ...een for monitoring power Touch Setup to set Local Display parameters Figure 23 Home Setup and System View Screens 4 3 7 in Local Display Setup Touch the Setup button on the Home Screen to bring up the...

Страница 31: ...ssword field to bring up the touch keyboard You will then be prompted for the password The initial default password is shown on the Setup screen 4 3 2 Setup Screen Buttons Buttons on the Setup screen...

Страница 32: ...rom RS422 to Ethernet change the Communication box under Routing from Serial to TCP or vice versa 5 Press OK on Properties Box Scroll screen to see box if necessary Touch each time and date field then...

Страница 33: ...listed in Table 2 below MODBUS MODE VIA RS422 VIA ETHERNET Settings Communication Mode Serial Serial Default Station 1 1 Modbus Protocol RTU RTU 32bit Work Mapping Motorola Motorola Addressing Decimal...

Страница 34: ...Display Bus System or Busway Base Modbus Address with Input Source Power monitoring Base Modbus Address with only Tap Off Box monitoring Reserved Modbus Addresses Bus System 1 1 2 17 30 Bus System 2...

Страница 35: ...feeds and Tap Off Boxes Figure 27 System View Screen 4 5 2 End Feed Information Screen To access an End Feed Information Screen Touch an End Feed Box on System View Screen OR On an End Feed Informati...

Страница 36: ...Max Demand Measurements resets to 0 Status Light for this device only Green No Alarms Red Alarms present on this device Yellow Warnings present on this device Full Load is a parameter defined by the u...

Страница 37: ...ble Screen appears Figure 30 Touch a device box to toggle between enabled green and disabled red Full Load is a parameter defined by the user in the device points list Demand is shown here as percent...

Страница 38: ...bled for viewing its name is blank When a Tap Off Box is disabled for viewing it is not shown in the bus run You can also specify a name for each bus run and a color Touch Name box to type name for bu...

Страница 39: ...ored but you have selected it for display in System View 4 7 Device Configuration Setting Up Device Screens You can modify the monitoring parameters for each device end feed or Tap Off Box by displayi...

Страница 40: ...PowerWave 2 Bus System BCMS Setup and Operation Cntl Nr PM375107 002 40 Figure 32 Tap Off Box Configuration Screen Touch cell a touch keypad appears enter new value Touch cell to toggle value...

Страница 41: ...ints Lists Modbus Register Maps can be downloaded from the PDI website http www pdicorp com services service software downloads Follow the instructions in section 3 1 Download Setup Software and Other...

Страница 42: ...any power feed BCMS Branch Circuit Monitoring System Input PM Input Power Monitor PCB MIB SNMP Management Information Block PIB Power Inserter Board Power feed Standard End Feed or Center Feed the enc...

Отзывы: