5.2.3 Connecting the cup electrode
)
Install the battery as described in section 5.1
)
Attach the measuring cable plug to the FMC/E connector.
Make sure the groove in the plug slides over the tips of the
connector. Turn the plug’s metal housing clockwise until it
locks into the connector.
)
Attach the measuring cable plug to the electrode connector.
The plug is locked once it clicks over the connector.
)
Turn the wheel of the cup electrode anticlockwise until it
comes away from the cup.
)
Fill the cup electrode with the material being measured and
close it.
The meter is now ready for setting (see section 5.3)
5.2.4 Connecting the concrete measuring set
)
Install the battery as described in section 5.1
)
Attach the measuring cable plug to the FMC/E connector.
Make sure the groove in the plug slides over the tips of the
connector. Turn the plug’s metal housing clockwise until it
locks into the connector.
)
Screw the contact sockets onto the measuring pins.
)
Connect the measuring pins to the red plugs.
Содержание Brookhuis FMC
Страница 25: ......