background image

31

FACTORY
INSTALLED
LOCATION

ALTERNATE

FIELD

LOCATION

POWER ENTRY HOLE
FILLER PLUG (FACTORY-
SUPPLIED LOOSE PARTS BAG)

UNUSED 7/8-IN. (22 mm) DIAMETER
POWER ENTRY HOLES

UNUSED 7/8-IN. (22 mm) DIAMETER
POWER ENTRY HOLES

POWER ENTRY HOLE
FILLER PLUG (FACTORY-
SUPPLIED LOOSE PARTS BAG)

A05058

Fig. 35 -- Relocating J-Box

Step 10 -- Combustion Air and Vent Pipe Systems

GENERAL

Vent system or vent connectors may need to be resized. For any

other appliances when resizing vent systems or vent

connectors, system or connector must be sized to approach

minimum size as determined using appropriate table found in the

NFGC or NSCNGPIC.
The PG9MXA can be vented as either a direct vent or as a

non-direct vent application. A direct vent system shall be

installed in accordance with the direct vent (2-pipe) procedures in

the following Combustion Air and Vent Pipe Systems section. For

non-direct vent (1-pipe) applications, refer to the non-direct vent

(1-pipe) procedures in the same section.
Multistory and common venting are prohibited.

DIRECT VENT/2-PIPE SYSTEM

In a direct-vent (2-pipe) system, all air for combustion is taken

directly from outdoor atmosphere, and all flue products are

discharged to outdoor atmosphere. A factory accessory vent

termination kit MUST be used in a direct vent (2-pipe) system.

NON-DIRECT VENT/1-PIPE SYSTEM

In a non-direct vent (1-pipe) system, all air for combustion is

taken from the area adjacent to furnace, and all flue products are

discharged to outdoor atmosphere. A factory-supplied perforated

disk assembly (in loose parts bag) MUST be used in

combustion-air pipe elbow.

MATERIALS

Combustion-air and vent pipe, fittings, primers, and solvents

must conform to American National Standards Institute (ANSI)

standards and American Society for Testing and Materials

(ASTM) standards. See Table 7 for approved materials for use in

the U.S.A.

CARBON MONOXIDE POISONING HAZARD

Failure to follow the steps outlined below for each appliance

connected to the venting system being placed into operation

could result in carbon monoxide poisoning or death.
The following steps shall be followed for each appliance

connected to the venting system being placed into operation,

while all other appliances connected to the venting system are

not in operation:
1. Seal any unused openings in venting system.
2. Inspect the venting system for proper size and horizontal

pitch, as required in the National Fuel Gas Code, ANSI

Z223.1--2006/NFPA 54--2006 or the CSA B149.1, Natural

Gas and Propane Installation Code and these instructions.

Determine that there is no blockage or restriction,

leakage, corrosion and other deficiencies, which could

cause an unsafe condition.

3. As far as practical, close all building doors and windows

and all doors between the space in which the appliance(s)

connected to the venting system are located and other

spaces of the building.

4. Close fireplace dampers.
5. Turn on clothes dryers and any appliance not connected to

the venting system. Turn on any exhaust fans, such as

range hoods and bathroom exhausts, so they are operating

at maximum speed. Do not operate a summer exhaust fan.

6. Follow the lighting instructions. Place the appliance being

inspected into operation. Adjust the thermostat so

appliance is operating continuously.

7. Test for spillage from draft hood equipped appliances at

the draft hood relief opening after 5 minutes of main

burner operation. Use the flame of a match or candle.

8. If improper venting is observed during any of the above

tests, the venting system must be corrected in accordance

with the National Fuel Gas Code, ANSI

Z223.1--2006/NFPA 54--2006 and/or CSA B149.1,

Natural Gas and Propane Installation Code.

9. After it has been determined that each appliance

connected to the venting system properly vents when

tested as outlined above, return doors, windows, exhaust

fans, fireplace dampers and any other gas-fired burning

appliance to their previous conditions of use.

!

WARNING

Содержание PG9MXA Series

Страница 1: ...tem be checked once a year by qualified service personnel The authority having jurisdiction gas inspection authority municipal building department fire department etc should be consulted before installation to determine the need to obtain a permit Consignes spéciales pour l installation de ventillation au Canada L installation faite au Canada doit se conformer aux exigences du code CSA B149 Ce sys...

Страница 2: ...the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless upon inspection the inspector ...

Страница 3: ...cal gas supplier or your distributor or branch for information or assistance The qualified installer or agency must use only factory authorized and listed kits or accessories when modifying this product WARNING Installing and servicing heating equipment can be hazardous due to gas and electrical components Only trained and qualified personnel should install repair or service heating equipment Untr...

Страница 4: ...ally for the detection of leaks to check all connections as specified in the GAS PIPING section of these instructions Always install furnace to operate within the furnace s intended rise range with a duct system which has an external static pressure within the allowable range as specified in the SET TEMPERATURE RISE section of these instructions and furnace rating plate When a furnace is installed...

Страница 5: ...ly the NFGC contact the American Gas Association 400 N Capitol N W Washington DC 20001 S A manufactured Mobile home installation must conform with the Manufactured Home Construction and Safety Standard Title 24 CFR Part 3280 or when this standard is not applicable the Standard for Manufactured Home Installation Manufactured Home Sites Communities and Set Ups ANSI NCS A225 1 and or CAN CSA Z240 MH ...

Страница 6: ...800 CFM 16 in 406mm round or 14 1 2 368mm x 12 in 305mm rectangle b For 1200 CFM 20 in 508mm round or 14 1 2 368mm x 19 1 2 in 495mm rectangle c For 1600 CFM 22 in 559mm round or 14 1 2 368mm x 23 1 4 in 591mm rectangle d For airflow requirements above 1800 CFM see Air Delivery table in Product Data literature for specific use of single side inlets The use of both side inlets a combination of 1 si...

Страница 7: ...u tuyau de sortie d air Pour les fournaises de 120 et 140 taille 1 po 25mm dégagement des matériaux combusitbles est requis au dessous MIN 1 4 TO 1 2 MAX Cette fournaise à air pulsé est équipée pour utilisation avec gaz naturel et altitudes comprises entre 0 3 050m 0 10 000 pi excepté queles fournaises de 140 taille sont pour altitudes comprises entre 0 2 135m 0 7 000pi Utiliser une trousse de con...

Страница 8: ...See Fig 5 CONDENSATE TRAP TUBING FACTORY SHIPPED ORIENTATION NOTE See Fig 6 or tube routing label on main furnace door to confirm location of these tubes 1 Collector Box Drain Inducer Housing Drain Relief Port and Pressure Switch Tubes These tubes should be factory attached to condensate trap and pressure switch ready for use in upflow applications These tubes can be identified by their connection...

Страница 9: ...lf by gently pushing tabs inward and rotating trap 3 Install casing hole filler cap factory supplied in loose parts bag into blower shelf hole where trap was removed CARBON MONOXIDE POISONING HAZARD Failure to follow this warning could result in personal injury or death Casing hole filler cap must be installed in blower shelf hole when condensate trap is relocated to prevent combustion products be...

Страница 10: ...ry connected to the High Pressure Switch and should not require any modification COLLECTOR BOX TUBE PINK CONDENSATE TRAP COLLECTOR BOX TUBE GREEN COLLECTOR BOX DRAIN TUBE BLUE INDUCER HOUSING DRAIN TUBE VIOLET CAP COLLECTOR BOX DRAIN TUBE BLUE WHITE STRIPED PLUG A01031 Fig 7 Alternate Upflow Configuration and Trap Location NOTE See Fig 6 or 7 or tube routing label on main furnace door to check for...

Страница 11: ...rom LOWER collector box drain tube blue and white striped label PLUG COLLECTOR BOX TUBE GREEN COLLECTOR BOX TUBE PINK COLLECTOR BOX DRAIN TUBE BLUE WHITE STRIPED COLLECTOR BOX EXTENSION DRAIN TUBE CONDENSATE TRAP INDUCER HOUSING DRAIN TUBE VIOLET COLLECTOR BOX EXTENSION TUBE DRAIN TUBE COUPLING COLLECTOR BOX DRAIN TUBE BLUE CAP COLLECTOR BOX EXTENSION TUBE A01024 Fig 9 Downflow Tube Configuration ...

Страница 12: ...lief port connection 6 Determine appropriate length cut and connect tube 7 Clamp tube to relief port connection CONDENSATE TRAP FREEZE PROTECTION Refer to Condensate Drain Protection section for recommendations and procedures Step 4 Horizontal Left Supply Air Discharge Applications In a horizontal left furnace application the blower is located to the right of the burner section and conditioned air...

Страница 13: ...bel on main furnace door to check for proper connections Modify tube as described below 1 Disconnect collector box pressure tube pink label attached to High Pressure Switch 2 Use smaller diameter tube factory supplied in loose parts bag to extend tube disconnected in item 1 3 Route extended tube a Behind inducer housing b Between blower shelf and inducer housing 4 Determine appropriate length cut ...

Страница 14: ...shelf to desired location perform the following 1 Remove 3 tubes connected to condensate trap 2 Remove trap from blower shelf by gently pushing tabs inward and rotating trap 3 Install casing hole filler cap factory supplied in loose parts bag into blower shelf hole where trap was removed CARBON MONOXIDE POISONING HAZARD Failure to follow this warning could result in personal injury or death Casing...

Страница 15: ...r recommendations and procedures PRESSURE SWITCH TUBING One collector box pressure tube pink label is factory connected to the High Pressure Switch for use when furnace is installed in UPFLOW applications This tube MUST be disconnected and used for the condensate trap relief port tube The other collector box pressure tube green label which was factory connected to the condensate trap relief port c...

Страница 16: ...ere available electric power and gas supplies meet specifications on the furnace rating plate S be attached to an air distribution system and be located as close to the center of the distribution system as possible Refer to Air Ducts section S be provided with ample space for servicing and cleaning Always comply with minimum fire protection clearances shown on the furnace clearance to combustibles...

Страница 17: ...onents after construction is completed After construction is complete verify furnace operating conditions including ignition input rate temperature rise and venting according to the manufacturer s instructions CAUTION UNIT DAMAGE HAZARD Failure to follow this caution may result in property or unit damage If this furnace is installed in an unconditioned space where the ambient temperatures may be 3...

Страница 18: ...ent air must be provided to avoid negative pressure in the equipment room or space A positive seal must be made between the furnace cabinet and the return air duct to prevent pulling air from the burner area and from draft safeguard opening CARBON MONOXIDE POISONING HAZARD Failure to follow this warning could result in personal injury or death The operation of exhaust fans kitchen ventilation fans...

Страница 19: ...10 6 300 178 3 8 400 237 8 10 500 297 3 6 600 186 8 9 900 280 3 13 200 373 7 16 500 467 2 19 800 560 6 23 100 654 1 0 00 NP NP NP NP NP NP NP NP NP b Not less than the sum of the areas of all vent connectors in the space The opening shall commence within 12 in 305 mm of the ceiling Appliances in the space shall have clearances of at least 1 in 25 mm from the sides and back and 6 in 153 mm from the...

Страница 20: ... DUCTS VENT THROUGH ROOF 1 SQ IN PER 1000 BTUH IN DOOR OR WALL 12 MAX 1 SQ IN PER 1000 BTUH IN DOOR OR WALL 12 MAX UNCONFINED SPACE INTERIOR HEATED SPACE CLEARANCE IN FRONT OF COMBUSTION AIR OPENINGS SHALL BE A T LEAST 3 IN 305mm 152mm 305mm A03175 Fig 19 Air for Combustion Ventilation and Dilution from Indoors c Combining space on different floor levels The volumes of spaces on different floor le...

Страница 21: ...ight and tighten inside Nut to secure arrangement NOTE Bottom closure must be used when leveling legs are used See Bottom Closure Panel section Step 2 Installation in Upflow and Downflow Applications NOTE For downflow applications this furnace is approved for use on combustible flooring when special base available from manufacturer Part No KGASB0201ALL is used Special base is not required when thi...

Страница 22: ...ssociation SMACNA or American Society of Heating Refrigerating and Air Conditioning Engineers ASHRAE or consult The Air Systems Design Guidelines reference tables available from your local distributor The duct system should be sized to handle the required system design CFM at the design static pressure PLENUM OPENING C A B D FLOOR OPENING A96283 Fig 21 Floor and Plenum Opening Dimensions DOWNFLOW ...

Страница 23: ...d shall be of such a size that the heat exchanger can be viewed for possible openings using light assistance or a probe can be inserted for sampling the air stream The cover attachment shall prevent leaks DUCTWORK ACOUSTICAL TREATMENT Metal duct systems that do not have a 90 degree elbow and 10 ft 3 M of main duct to the first branch take off may require internal acoustical lining As an alternativ...

Страница 24: ...ion to ensure proper drainage 3 For non direct vent 1 pipe application bottom side combustion air entry cannot be used when furnace is installed with hangers as shown A PREFERRED ROD LOCATION B ALTERNATE ROD LOCATION DRAIN 5 3 4 3 8 IN HEX NUT WASHER 4 REQD PER ROD VENT COMBUSTION AIR PIPE DIRECT VENT 2 PIPE APPLICATION ALL SIZES COMBUSTION AIR INTAKE NON DIRECT VENT 1 PIPE APPLICATION 3 IN 76 mm ...

Страница 25: ...ble filter or a factory specified high efficiency disposable filter see cabinet instructions If installing the filter in the furnace blower compartment determine location for filter and relocate filter retaining wire if necessary See Table 4 to determine correct filter size for desired filter location Table 4 indicates filter size location and quantity shipped with this furnace See Fig 2 for locat...

Страница 26: ...p of 0 5 in wc based on a 0 60 specific gravity gas Ref Table 9 2 NFGC Step 7 Gas Piping Gas piping must be installed in accordance with national and local codes Refer to current edition of NFGC in the United States Canadian installations must be made in accordance with NSCNGPIC and all authorities having jurisdiction Gas supply line should be a separate line running directly from meter to furnace...

Страница 27: ...ble soap solution made specifically for the detection of leaks to check all connections A fire or explosion could result causing property damage personal injury or loss of life WARNING Gas line grommet factory supplied loose parts bag should be used when installing gas piping Gas line entry hole filler plug should be installed in unused gas line entry hole See Fig 30 NOTE The gas valve inlet press...

Страница 28: ...r control will lock out Control is grounded through green yellow wire routed to gas valve C terminal and burner box screw CAUTION See Fig 31 32 and 50 57 for field wiring diagram showing typical field 115 v and 24 v wiring Check all factory and field electrical connections for tightness Field supplied wiring shall conform with the limitations of 63 rise 115 V WIRING Before proceeding with electric...

Страница 29: ...al Heating and Cooling Application Wiring Diagram 1 Stage Thermostat and Condensing Unit 115 V FUSED DISCONNECT SWITCH WHEN REQUIRED JUNCTION BOX CONTROL BOX 24 V TERMINAL BLOCK THREE WIRE HEATING ONLY SEVEN WIRE 2 STAGE THERMOSTAT TERMINALS FIELD SUPPLIED FUSED DISCONNECT 2 SPEED CONDENSING UNIT FURNACE G R W2 Y2 G Y1 C GND GND GND GND GND GND FIELD 24 V WIRING FIELD 115 208 230 460 V WIRING FACT...

Страница 30: ...TER POWER ENTRY HOLES POWER ENTRY HOLE FILLER PLUG FACTORY SUPPLIED LOOSE PARTS BAG A05113 Fig 34 Factory Installed J Box Location 24 V WIRING Make field 24 v connections at 24 v terminal block on furnace See Fig 36 Connect terminal Y Y2 as shown in Fig 31 and 32 for proper cooling operation Use only AWG No 18 color coded copper thermostat wire for lengths up to 100 ft For wire lengths over 100 ft...

Страница 31: ...OISONING HAZARD Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could result in carbon monoxide poisoning or death The following steps shall be followed for each appliance connected to the venting system being placed into operation while all other appliances connected to the venting system are not in operation 1 Seal any unu...

Страница 32: ...32 A08343 Fig 36 Wiring Diagram ...

Страница 33: ...o terminate exactly as shown in Fig 44 for direct vent 2 pipe system and Fig 45 for non direct vent 1 pipe system WARNING An abandoned masonry chimney may be used as a raceway for properly insulated and supported combustion air when applicable and vent pipes Each furnace must have its own set of combustion air and vent pipes and be terminated individually as shown in Fig 44 for Direct Vent 2 Pipe ...

Страница 34: ...plied in loose parts bag in combustion air elbow using RTV or by cementing as shown in Fig 39 For 120 000 Btuh size units only separate the 2 halves of perforated disk assembly and use only the shouldered disk half 2 Determine the length of straight portion of combustion air inlet pipe from Fig 39 3 Cut field supplied 2 in 51 mm diameter PVC pipe to length as determined per Fig 39 4 Permanently at...

Страница 35: ...35 A05009 Table 8 Direct Vent Termination Clearance ...

Страница 36: ...36 A05013 Table 9 Other than Direct Vent Termination Clearance ...

Страница 37: ... pipe permanently to combustion air intake housing since it may be necessary to remove pipe for service of burner box components or flame sensor Attachment of Combustion Air Intake Housing Plug Fitting The combustion air intake plug fitting must be installed in unused combustion air intake housing This fitting must be attached by using RTV sealant or by drilling a 1 8 in hole in fitting using hole...

Страница 38: ...embly Length of Straight Pipe Portion of Combustion Air Inlet Pipe Assembly IN mm CASING WIDTH A 17 1 2 445 8 1 2 1 2 216 13 21 533 10 1 2 1 2 267 13 24 1 2 622 12 1 2 305 13 NOTE Direct Vent 2 pipe ONLY vent pipe system has the same diameter and same length as combustion air pipe mentioned in section Assembly of Combustion Air Pipe Direct Vent 2 Pipe system ONLY NOTE Do not count elbows or pipe s...

Страница 39: ... 61 18 6 61 18 6 80 000 2 Pipe or 2 in Concentric 2 51 2 51 49 14 9 44 13 4 30 9 1 25 7 6 25 7 6 15 4 6 2 1 2 64 2 1 2 64 70 21 3 70 21 3 70 21 3 70 21 3 70 21 3 70 21 3 100 000 2 Pipe or 3 in Concentric 2 1 2 64 2 1 2 64 35 10 7 26 7 9 16 4 9 16 4 9 6 1 8 NA 3 76 3 76 70 21 3 70 21 3 70 21 3 70 21 3 66 20 1 61 18 6 120 000 2 Pipe or 3 in Concentric 3 76 NA 14 4 3 9 2 7 NA NA NA NA NA 3 76 63 19 2...

Страница 40: ...A NA 2 51 2 51 60 18 3 55 16 8 54 16 5 49 14 9 48 14 6 47 14 3 80 000 2 Pipe or 2 in Concentric 2 51 2 51 41 12 5 36 11 0 23 7 0 18 5 5 17 5 2 8 2 4 2 1 2 64 2 1 2 64 70 21 3 70 21 3 70 21 3 70 21 3 70 21 3 70 21 3 100 000 2 Pipe or 3 in Concentric 2 1 2 64 2 1 2 64 29 8 8 21 6 4 12 3 7 11 3 4 NA NA 3 76 3 76 70 21 3 67 20 4 62 18 9 57 17 4 52 15 8 47 14 3 120 000 2 Pipe or 3 in Concentric 3 76 no...

Страница 41: ... 20 6 1 15 4 6 10 3 0 ALTITUDE FT M UNIT SIZE BTUH DIRECT VENT 2 PIPE ONLY NON DIRECT VENT 1 PIPE ONLY NUMBER OF 90 ELBOWS TERMINATION TYPE PIPE DIA IN PIPE DIA IN 1 2 3 4 5 6 9001 to 10 000 2743 to 3048 60 000 2 Pipe or 2 in Concentric 2 51 2 51 45 13 7 40 12 2 38 11 6 33 10 1 31 9 4 29 8 8 80 000 2 Pipe or 2 in Concentric 2 51 2 51 30 9 1 25 7 6 14 4 3 9 2 7 7 2 1 NA 2 1 2 64 2 1 2 64 57 17 4 55...

Страница 42: ...k insertion depth on pipe 7 After pipes have been cut and preassembled apply generous layer of cement primer to pipe fitting socket and end of pipe to insertion mark Quickly apply approved cement to end of pipe and fitting socket over primer Apply cement in a light uniform coat on inside of socket to prevent buildup of excess cement Apply second coat 8 While cement is still wet twist pipe into soc...

Страница 43: ...pe According to Table 12 2 in 51 mm diameter pipe is good for 35 ft 11 M with 3 elbows but only 30 ft 9 M with 5 elbows Therefore 2 1 2 in 64 mm diameter pipe must be used for both vent and combustion air pipes since larger required diameter must always be used for both pipes For a non direct vent 1 pipe system Table 13 indicates that this application would allow a 2 in 51 mm diameter vent pipe If...

Страница 44: ...following guidelines 1 Comply with all clearance requirements stated in Table 8 or Table 9 per application 2 Termination or termination kit should be positioned where vent vapors will not damage plants shrubs or air conditioning equipment 3 Termination or termination kit should be positioned so that it will not be affected by wind eddy such as inside building corners nor by recirculation of flue g...

Страница 45: ...whichever is greater typ A At least 36 in A Maintain 12 in 305mm min clearance above highest anticipated snow level Maximum of 24 in 614mm above roof 90 Note A denotes 0 to 2 in Between the first 2 vents Third vent must be 36 in away typ 914mm 305mm 914mm 305mm 305mm 914mm 914mm 457mm 51mm 914mm A05090 Fig 44 Combustion Air and Vent Pipe Termination for Direct Vent 2 pipe System Abandoned masonry ...

Страница 46: ...se pipe fittings Clean and cement using same procedures as used for system piping 4 Check required dimensions as shown in Fig 44 Multiventing and Vent Terminations When 2 or more PG9MXA Furnaces are vented near each other each furnace must be individually vented NEVER common vent or breach vent PG9MXA furnaces Direct Vent 2 Pipe System ONLY When 2 or more PG9MXA furnaces are vented near each other...

Страница 47: ...PE 3 WRAPS MINIMUM A93036 Fig 47 Condensate Trap Heat Tape Step 1 General The furnace must have a 115 v power supply properly connected and grounded NOTE Proper polarity and proper grounding must be maintained for 115 v wiring If polarity is incorrect or furnace is not grounded control status indicator light will flash rapidly and the furnace will not operate Natural gas service pressure must not ...

Страница 48: ...r housing and replace drain connection cap and clamp A99119 Fig 49 Filling Condensate Trap Step 3 Purge Gas Lines After all connections have been made purge the gas lines and check for leaks FIRE AND EXPLOSION HAZARD Failure to follow this warning could result in personal injury death or property damage Never purge a gas line into a combustion chamber Never test for gas leaks with an open flame Us...

Страница 49: ...nds the control CPU will close the gas valve GV M and the control CPU will repeat the ignition sequence for up to three more Trials For Ignition before going to Ignition Lockout Lockout will be reset automatically after three hours by momentarily interrupting 115 vac power to the furnace or by interrupting 24 vac power at SEC1 or SEC2 to the furnace control CPU not at W W1 G R etc If flame is prov...

Страница 50: ...high cooling speed and the R to G and Y1 and Y Y2 circuits switch the furnace blower motor BLWM to COOL speed NOTE When transitioning from low cooling to high cooling the outdoor unit compressor will shutdown for 1 minute while the BLWM continues to run at low cool speed same speed as LO HT until the outdoor unit compressor comes back on at high speed The electronic air cleaner terminal EAC 1 is e...

Страница 51: ...e with Single Speed Air Conditioner A00276 Fig 51 Two Stage Furnace with Two Speed Air Conditioner A00277 Fig 52 Two Stage Furnace with Single Speed Heat Pump Dual Fuel A00278 Fig 53 Two Stage Furnace with Two Speed Heat Pump Dual Fuel ...

Страница 52: ...peed Heat Pump A00280 Fig 55 Dual Fuel Thermostat With Two Stage Furnace and Two Speed Heat Pump A00281 Fig 56 Two Stage Thermostat With Two Stage Furnace and Two Speed Air Conditioner A00282 Fig 57 Single Stage Thermostat With Two Stage Furnace and Two Speed Air Conditioner ...

Страница 53: ...el applications 10 NO connection should be made to the furnace HUM terminal when using a Thermidistat 11 Optional connection If wire is connected dip switch No 1 on furnace control should be set in ON position to allow Thermidistat Thermostat to control furnace staging 12 Optional connection If wire is connected ACRDJ jumper on furnace control should be removed to allow Thermidistat Thermostat to ...

Страница 54: ...LWM will remain on for the selected blower OFF delay period then switch to continuous blower speed When the R to W W1 and Y Y2 R to W W1 and Y Y2 and G R to W W1 and Y1 and Y Y2 or R to W W1 and Y1 and Y Y2 and G circuits are energized the furnace control CPU will switch to or turn on the blower motor BLWM at COOL speed and begin a high heat cycle The blower motor BLWM will remain on until the end...

Страница 55: ...ator seal caps that conceal adjustment screws for low and high heat gas valve pressure regulators See Fig 58 c Move setup switch SW 1 on control center to ON position This keeps furnace locked in low heat operation d Jumper R and W W1 thermostat connections on control to start furnace e Turn low heat adjusting screw 3 32 hex Allen wrench counterclockwise out to decrease input rate or clock wise in...

Страница 56: ...ice Size and High Low Heat Manifold Pressures for Correct Inputs for Use with 060 Through 120 Size Furnaces Only Tabulated Data Based on 20 000 13 000 Btuh per Burner Derated 2 Percent for Each 1000 ft 305 M Above Sea Level A08376A ...

Страница 57: ...sures for Correct Inputs Continued for Use With 060 Through 120 Size Furnaces Only Tabulated Data Based on 20 000 13 000 Btuh per Burner Derated 2 Percent for Each 1000 ft 305 M Above Sea Level A08376B NOTE Percents of derate are based on midpoints of U S altitude ranges ...

Страница 58: ...in place for proper input to be clocked d Obtain yearly heat value average for local gas supply NOTE Be sure heating value of gas used for calculations is correct for your altitude Consult local gas utility for altitude adjustment of gas heating value e Check and verify orifice size in furnace NEVER ASSUME THE ORIFICE SIZE ALWAYS CHECK AND VERIFY f Turn off all other gas appliances and pilots g Mo...

Страница 59: ...9 73 147 367 124 29 58 145 SET TEMPERATURE RISE UNIT DAMAGE HAZARD Failure to follow this caution may result in unit component damage Temperature rise must be within limits specified on furnace rating plate Recommended operation is at midpoint of rise range or slightly above CAUTION Place SW 1 in ON position Jumper R to W W1 and W2 to check high gas heat temperature rise To check low gas heat temp...

Страница 60: ...at must be checked before the installation is complete The flame sensor gas valve and pressure switch were all checked in the Start up procedure section as part of normal operation 1 Check Primary Limit Control This control shuts off gas control system and energizes air circulating blower motor if furnace overheats Recommended method of checking this limit control is to gradually block off return ...

Страница 61: ...pe Sloped To Furnace Pipe Insulation ____________ Over Ceilings ________ ____________ Low Ambient Exposed Pipes Condensate Drain ____________ Unit Level or Pitched Forward ____________ Internal Tubing Connections Free of Kinks and Traps ____________ External Drain Connection Leak Tight and Sloped ____________ Condensate Trap Primed before Start Up ____________ Heat Tape Installed if Required CHECK...

Страница 62: ...Free of Kinks and Traps ____________ External Drain Connection Leak Tight and Sloped ____________ Condensate Trap Primed before Start Up ____________ Heat Tape Installed if Required CHECKLIST START UP ____________ Gas Input Rate Set Within 2 percent of Rating Plate ____________ Temperature Rise Adjusted Thermostat Anticipator ____________ Anticipator Setting Adjusted or ____________ Cycle Rate 3 C...

Отзывы: