5 Scope of delivery [specialist]
2020/04
993x083x-mub-en – V04
13
1.
Take off the thermometer handles (A-2,
F-2) and remove the insulating front shell
of the HeatBloC
®
.
2.
Unscrew the nuts on the lower
connections of the HeatBloC
®
and take out the sealing rings.
If a PAW modular distribution manifold
or transition connection is used:
3.
Put the two nuts over the flanges.
4.
Insert the sealing rings into the nuts.
5.
Put the HeatBloC
®
onto the two nuts.
6.
Tighten the nuts.
Make sure that the nuts do not get
jammed and that the sealing rings
do not slip.
7.
Connect the HeatBloC
®
to the installation
by using the pipes. The installation to
the piping must be carried out without
any tension.
8.
Connect the pump.
9.
Carry out a pressure test and
check all thread connections.
10.
Mount the insulating front shell and
the thermometer handles (A-2, F-2).
5
Scope of delivery [specialist]
NOTICE
Complaints and requests/orders of spare parts will only be processed with information on
the serial number! The serial number is placed on the return pipe of the heating circuit.
Flange
(side view)
Flange
(top view)
Nut
Sealing ring
1
2
3
Содержание HeatBloC K38 DN 25
Страница 14: ...5 Scope of delivery specialist 14 993x083x mub en V04 2020 04 5 1 Spare parts DN 25 ...
Страница 16: ...5 Scope of delivery specialist 16 993x083x mub en V04 2020 04 5 2 Spare parts DN 32 ...
Страница 21: ...7 Disposal 2020 04 993x083x mub en V04 21 ...
Страница 22: ...7 Disposal 22 993x083x mub en V04 2020 04 ...
Страница 23: ...7 Disposal 2020 04 993x083x mub en V04 23 ...