4 Commissioning [specialist]
18
99609x4x5-mub-en – V05
2017/05
18.
Remove the hoses of the flush and fill station and
screw the sealing caps onto the fill and drain
valves.
The sealing caps only serve to protect the valves
against dirt. They are not designed to take up high
system pressures. The ball valves must be closed.
19.
Mount the insulating front shell.
20.
Set to automatic mode on the controller (see
controller instructions).
The commissioning of the solar installation is now
completed.
Please fill in completely the commissioning report
on page 31.