3 Assembly and installation [specialist]
2017/05
99609x4x5-mub-en – V05
9
3
Assembly and installation [specialist]
The location of installation must be dry, load-carrying, frost-proof and protected against
ultraviolet radiation to prevent material damage to the installation. Furthermore, the access to
the control and safety equipment must be guaranteed at all time during operation!
The discharge line of the safety equipment should be guided into a heat-resistant container with
corresponding size. This allows you to avoid uncontrolled discharging into the environment and
to easily refill the circuits!
NOTICE
Material damage due to high temperatures!
Install the fitting group at a sufficient distance from the collector field, since the solar fluid may
be very hot near the collector.
It may be necessary to install an intermediate tank in order to protect the expansion tank.
1.
You can use a drilling template in order to facilitate the
installation, which you can find on the station.
2.
Copy the mounting holes to the mounting surface.
3.
Drill the holes and insert appropriate wall plugs into the
holes.
4.
Screw in the screws and let them stick about 4 cm out of
the wall.
5.
Remove the station from the packaging.
6.
Remove the insulating front shell. Hang the module onto
the screws and tighten the screws.
WARNING
Personal injury due to polluted potable water!
The heating water contains harmful substances, that must not be washed into the
domestic hot water circuit.
If the station was used for charging a buffer tank there is still, after draining,
heating water in the valves and fittings and in the pump of the secondary circuit. It
can not be removed without residue.
The station must not be connected to a domestic hot water circuit.