34
Checklist B maintenance works qualified personnel
4.2
Maintenance works
Enter Result
Inspection of MVHR unit based according to the currently valid national standards
Informal report for comments on MVHR unit's condition
Use additional sheet of paper for adding reports of subsequent years
No.
Parts
Annually
Result
20...
20...
20...
20...
20...
1
Ventilator / Ventilation
Device
Have the components
been cleaned?
-
Ventilator
-
enthalpy
exchanger
-
air handling
cylinders of the
device
yes / no
Frost protection / thaw
setup functional?
yes / no
Is the transmission of
structure-born noise,
fixing prevented?
yes / no
Are the operation
displays functional?
yes / no
2
Electrical Engineering/
Regulation
Are the cable
connections and
terminal fixing
secure?
yes / no
Are the control
devices and control
units functional?
yes / no
3
Air duct / heat insulation
Is the device cleaned
(if required)? Is the
testing in place? If
required, refer to VDI
6022 for cleaning
yes / no
Is the heat insulation
and vapour barrier in
order?
yes / no
Are the flexible
connections between
the device and the air
duct functional
?
yes / no
4
Ventilator, ventilation device,
Filter, filter status
Are the stipulated
filter class adhered
to?
yes / no
5
Ventilator / ventilation device
and heat-producing
appliance if available
Is the safety device
with heat-producing
appliance functional?
yes / no
6
Exhaust air/supply air-
passage
Seat and lock given?
yes / no
Is the stipulated filter
class adhered to?
yes / no
Filter, filter status ok?
yes / no
Is the air quantity
according to the log?
yes / no
7
Overflow air passages
Is there is free cross-
section?
yes / no
No transmission of
structure-born noise
and transmission of
airborne sound?
yes / no
Содержание FOCUS 200 Base
Страница 1: ...Version 1 0_06 2016 DE...
Страница 31: ...31 Dimensional sketch 3 7 3 Fig 32 Dimension drawing...
Страница 32: ...32 Circiut diagram FOCUS 200 base 3 7 4 Fig Terminal assignment FOCUS 200 Base...
Страница 37: ...37 Product fiche 4 5...