background image

  25 

  Maintenance and repair by qualified personnel 

3.5

 

If regular maintenance work is not performed at the FOCUS, this impairs the functioning of 
the comfort ventilation.

 

The maintenance and repair by qualified personnel should only be carried out by a maintenance service 
on  the  basis  of  a  maintenance  contract.  The  maintenance  and  repair  measures  for  the  FOCUS  include 
the inspection and cleaning of the fans and the heat exchanger. Cleaning of the heat exchanger is carried 
out depending on the degree of soiling; the maintenance interval should not exceed two years. 

The maintenance work performed must be documented in check list B! 

  Inspecting and cleaning the heat exchanger 

3.5.1

In order to do so, proceed as follows: 

1.  Disconnect the FOCUS from the power supply. 

2.  Press both spring locks 

on the bottom side

 

and unlock with it the front plate.  

 

Fig 26: Press of the spring locks 

3.  Remove the front plate 

B

 according the step sequence 1. and 2. and gradually to the directions of 

the arrows. Open the front plate in a corner from maximally 15 ° and hang them from the tin fold of 
the housing.   

Содержание FOCUS 200 Base

Страница 1: ...Version 1 0_06 2016 DE...

Страница 2: ...nder FOCUS 200 Base series The types of device FOCUS 200 Base are hereinafter referred to under the product name FOCUS unless details are for type differentiation The heat recovery unit HRU FOCUS has...

Страница 3: ...ost ventilation mode with external boost ventilation sensing device 11 2 2 3 Maintenance by the operator 11 2 3 Replacement of the filter 11 2 3 1 Reset of filter runtime 14 2 3 2 What to do in the ev...

Страница 4: ...9 3 7 1 Technical specification 29 3 7 2 Dimensional sketch 31 3 7 3 Circiut diagram FOCUS 200 base 32 3 7 4 4 Annexes 33 Checklist A Maintenance Works User 33 4 1 Checklist B maintenance works qualif...

Страница 5: ...tem The warranty period has elapsed Normal wear Safety 1 2 Please always observe the safety instructions in this operating manual The non observance of the safety instructions warning notices notes an...

Страница 6: ...ioning of electrical equipment Knowledge and attention of the building security and installation rules valid on the spot of the appropriate municipalities the waterworks and power plant and other offi...

Страница 7: ...ade of high quality polypropylene provides the necessary heat insulation and device noise protection The FOCUS includes two maintenance free 230 Vac radial fans with the integrated power supply unit a...

Страница 8: ...imit at the device falls below the threshold value of 3 C the fans are switched off temporarily if no external frost protection measure on the device is effective The device control activates an optio...

Страница 9: ...king By pushing again the extract air mode is deactivated again This push button cannot be operated when the ventilation device is run with a heat producing appliance unless the supply air mode is act...

Страница 10: ...ting mode normal mode exhaust and supply air LED extract air symbol lights Operating mode extract air mode active extract air only LED supply air symbol lights Operating mode supply air mode active su...

Страница 11: ...rs available inside the ventilation plant and change them if necessary A replacement or cleaning of the filter mats at the extract air valves e g bathroom kitchen W C s should be carried out every 2 3...

Страница 12: ...eat exchanger from the foam material housing Besides take the pull band at one of the ends and go besides counter hold the device with the other hand Fig 6 Dismantlement of the foam cover for filter a...

Страница 13: ...regard to the flow direction F The filters are marked with an arrow according to the required flow direction Fig 8 Install the new filter Pollen filters are to be inserted in the filter slide in comp...

Страница 14: ...in the living space Therefore the long term shutdown of the FOCUS has to be avoided For the period of absence the plant should be operated at the lowest fan speed or in the un occupied mode Disposal 2...

Страница 15: ...s to be mounted horizontally During the wall mounting check the required load capacity of the wall construction dead load of FOCUS 25 kg and the safe mounting option of the mounting sheet For inapplic...

Страница 16: ...e rubber buffer D in the bottom corner region on the rear panel of the device Fig 11 Mounting of the rubber puffer 3 Hang the FOCUS on the mounting sheet by hooking the tongues B in the slot openings...

Страница 17: ...parts Fig 13 Parts of the mounting frame Mount the individual parts of the mounting frame in accordance with the figures Thereby proceed as follows 1 The short side part is vertically offset and to s...

Страница 18: ...sheet metal screws D in the designated bore holes E of the side part Fig 17 Screwing of the mounting sheet to the mounting frame 5 Now adjust the completed mounting frame perpendicularly and stably to...

Страница 19: ...ided since during defrosting of possible ice formations they might fall onto the blades of the exhaust air fan and cause damage to these blades Fig 20 Arrangement drainage of the intake air duct and e...

Страница 20: ...ordance with the schematic diagram Fig 22 Condensate connection Version LEFT The condensate drain must not be directly connected to the sewage system e g finishing freely in a hopper with a siphon at...

Страница 21: ...s of the control panel The cables have to be led through the cable glands M16 The required number of pre punched cable bushings C has to be broken off Fig 23 Surface of the electrical connections Posi...

Страница 22: ...unden werden Terminal X0 control board Signal X0 01 12 V X0 02 Us control voltage supply air fan X0 03 Ue control voltage exhaust air fan X0 04 GND Tab 6 Terminal assignment terminal X0 control unit C...

Страница 23: ...s 1 200 W Terminal X4b control board Wire cable preheater battery X4b 44 Wire 1 PE X4b 45 Wire 2 Lvo X4b 46 Wire 3 N Tab 9 Terminal assignment connection external preheater battery Commissioning of th...

Страница 24: ...lume flows to the air valves by means of a volume flow hood and an anemometer see air volume log Adjustment of the air gap on the valve must not be too narrow aerodynamic noises Better Adjustment of a...

Страница 25: ...he heat exchanger is carried out depending on the degree of soiling the maintenance interval should not exceed two years The maintenance work performed must be documented in check list B Inspecting an...

Страница 26: ...the filters and the heat exchanger D from the foam housing Thereby take and pull the strap at one of the ends and counter hold the device with the other hand at the same time Fig 28 Dismantlement of t...

Страница 27: ...housing Fig 30 Remove the heat exchanger 7 Clean the heat exchanger as following Dip the heat exchanger into warm water several times max 40 C Subsequently thoroughly rinse the heat exchanger using w...

Страница 28: ...ting the heat exchanger into the HRU 9 Afterwards mount all parts in reverse order 10 Re establish the mains connection Replacement of the heat exchanger against the summer box 3 5 2 The summer box ha...

Страница 29: ...t air connection Technical specification 3 7 2 General specification Description value Type of heat exchanger Counter flow channel heat exchanger of plastic Casing internal lining Steel sheet galvanis...

Страница 30: ...sion acc to DIN EN ISO 3743 1 distance of 3 m 30 dB A at 155 m h 100 Pa 24 dB A at 200 m h 100 Pa Tab 13 Operating data p characteristic curve Please note The numerical values of the p characteristic...

Страница 31: ...31 Dimensional sketch 3 7 3 Fig 32 Dimension drawing...

Страница 32: ...32 Circiut diagram FOCUS 200 base 3 7 4 Fig Terminal assignment FOCUS 200 Base...

Страница 33: ...ilter change cycle 90 days Quarter Year I II III IV 20 20 20 20 20 20 20 20 20 20 2 Clean extract air prefilter filter in extract air valves change approx every 2 months Quarter Year I II III IV 20 20...

Страница 34: ...yes no Are the control devices and control units functional yes no 3 Air duct heat insulation Is the device cleaned if required Is the testing in place If required refer to VDI 6022 for cleaning yes n...

Страница 35: ...planned There is an option to clean yes no yes no yes no 5 Exhaust air line There is an option to clean yes no 6 Exhaust air ventilator There is an option to clean yes no 7 Control unit and control de...

Страница 36: ...clean approx days used Very dirty Supply Air Ventilator stage No Room Description Project Date Measurement Data m h m s m h m s Exhaust Air Ventilator stage No Room Description Project Date Measureme...

Страница 37: ...37 Product fiche 4 5...

Страница 38: ...ct label which applies for the ventilation plant conforms to the installation of the plant and to the model identifier of the product data sheet The product label shows the following information from...

Страница 39: ...ctive 95 16EG New version Applicable Standards EN ISO 12100 Safety of machines risk assessment and risk minimization EN ISO 3744 Acoustic Provision of sound power levels of noise sources from sound pr...

Страница 40: ...Version 1 0_06 2016 DE PAUL W rmer ckgewinnung GmbH August Horch Str 7 08141 Reinsdorf Germany Tel 49 0 375 30 35 05 0 Fax 49 0 375 30 35 05 55 info paul lueftung de www paul lueftung de...

Отзывы: