background image

 

Application Note: Configuring the IPLink™ Router for Dual Routed Application

11

 

– For the physical links to be free of alarms and errors, the minimum parameters must match those of the 

provider’s E1 configuration-number of time slots, clear channel or structured E1, line coding, termina-
tion impedance which is 75 Ohms for coaxial and 120 Ohms for twisted pair physical media.

 

3.

 

Once the physical layer is up, the next checks apply to the Datalink layer, layer 2. Look at the Summary 
and Connect State information on the I

 

Edit ’PPP’

 

 page. 

– If it is not connected, determine whether the link is in the process of connecting or dead. If dead, the 

remote end may be causing a problem. If it is trying to connect without success, it may be a synchroni-
zation problem which may be caused by an error in the clocking mode of the E1 configuration. Rarely 
should you need to change the other parameters. In fact, it is best not to change parameters like LCP 
Max Configure, LCP Max Failure, and LCP Max Terminate. Any changes to these parameters can cause 
erratic and unreliable connections.

 

4.

 

If the PPP link is UP and connected, you may not be able to transfer data from an ill-configured routing 
table. Be aware of the ping’s response to the attempted ping. The messages “Request timed out” and “host 
destination not available” indicate different routing problems. Hence the importance to understand their 
meaning and where in the routed path, the ping is failing.

 

5.

 

You can also issue a ping or traceroute command from the IPLink. Under the System Configuration menu, 
click on the Tools link for issuing Pings and Traceroute commands from the IPLink.

 

Date Created

 

March 1, 2006 

 

Last Updated

 

March 31, 2006 3:51 pm

7622 Rickenbacker Drive
Gaithersburg, MD 20879
Tel: +1 301.975.1000
Fax: +1 301.869.9293

Содержание IPLink 2620/KK

Страница 1: ...be enabled between the two subnets This lets you use private IP addresses ensuring the internal network structure is invis ible to users on the Internet The issue of security with comprehensive NAT co...

Страница 2: ...ection is the correct selection Detailed Information You will need the following information to correctly define the configurable parameters for this IPLink appli cation Upstream Router Details The up...

Страница 3: ...thentication Initial Configuration Install and configure your IPLink WAN Access Router according to the directions in the 2603 2620 IPLink Quick Start Guide shipped with your router and available onli...

Страница 4: ...onnecting to a service pro vider Consequently we want to use its clock as the synchronizing source In other words configure Clocking Mode to receive The second point to notice is that the two WAN port...

Страница 5: ...onnected Connect a valid E1 line to WAN Port 1 on the rear of the 2620 KK and refresh the Status web page If the configuration matches the E1 parameters from the service provider the alarms will cease...

Страница 6: ...ferent subnet than either the Ethernet or other WAN port and is called subnet 1 in figure 1 The subnet on WAN port 1 is 192 168 1 0 24 You need the IP address of the service provider s upstream route...

Страница 7: ...7 WAN Port 1 PPP Routed configuration From the WAN connections web page click on the Edit for this WAN service You now see the Edit Net work Connection webpage with numerous hyperlinks Click on Edit...

Страница 8: ...e button Figure 9 Configuring IP addresses for local and remote ends of routed PPP link Assuming that you have connected the WAN Port 1 to the E1 line the routed PPP session should come up When it is...

Страница 9: ...IP address of WAN port 1 192 168 2 The interface is ppp 0 See figure 11 for the correct configuration of the default route Figure 11 Adding Gateway address to routing table Click on the IP routes hyp...

Страница 10: ...idges The link has fully connected Figure 14 Bridged PPP link up and running Test the connection 1 The first tests of the PPP connections are for successful pings to the IP address of WAN Port 1 s IP...

Страница 11: ...in the clocking mode of the E1 configuration Rarely should you need to change the other parameters In fact it is best not to change parameters like LCP Max Configure LCP Max Failure and LCP Max Termin...

Страница 12: ...tify the referrenced subnet that is 1 2 or 3 Table 2 Dual Routed Application Worksheet Upstream Router 2620 KK WAN Port 1 WAN Port 2 Ethernet Channelized E1 Line Coding n a Impedance 120 or 75 Ohms n...

Отзывы: