Installing the SmartNode extender
31
Model 2292 & 2294 Series Getting Started Guide
3 • Hardware installation
Figure 13. SmartNode extender front panel LEDs and Console port locations (SmartNode 2294 shown)
4.
Verify that the green
Power
LED is lit (see
figure 13
).
Congratulations, you have finished installing the SmartNode extender! Now go to chapter 4,
“Getting started
with the SmartNode”
on page 32.
Console
port
Power
VoIP Link
Enet 0
Link
Run
Enet 0
Activity
Enet 0
100M
Enet 1
Link
Enet 1
100M
Enet 1
Activity
Voice
Port 0/0
Voice
Port 0/1
Voice
Port 0/2
Voice
Port 0/3
Link 100M Activity
0/0
0/1
0/2
0/3
Power
Console
Leased-Line Extender Over IP
SmartNode 2294
Run
VoIP
Link
Link 100M Activity
L
in
k 1
0
0
M
A
c
ti
v
it
y
0
/0
0
/1
0
/2
0
/3
Enet 0
Por
ts
P
o
w
e
r
Console
Leased-Line Extender Over IP
SmartNode 2294
R
u
n
V
o
IP
L
in
k
L
in
k 1
0
0
M
A
c
ti
v
it
y
Enet 1
Содержание SmartNode 2294
Страница 13: ...About this guide Model 2292 2294 Series Getting Started Guide 13...
Страница 19: ...19 Chapter 2 Applications overview Chapter contents Typical application 20 Leased line extension 20...
Страница 36: ...36 Chapter 5 LEDs status and monitoring Chapter contents Status LEDs 37...
Страница 52: ...52 Appendix E Installation checklist Chapter contents Introduction 53...