EN
104
EN
105
2
2
1
2
1
3
2
1
1
HOOK LATCHES
Make sure that the latch
6
of the
mounting hook
1
is closed, after it has
been fastened to the mounting point.
1
LIFTING LOADS
On the front of the chain hoist an arrow
is indicating “UP” (Up - lifting).
1
Begin to lift the load by slowly pulling
the hand chain
3
in the UP direction.
2
LOWERING LOADS
On the front of the chain hoist an arrow
is indicating “DN” (Down - lowering).
1
To indicate the wear of the load chain,
measure the load chains link ø and the
inner length of 5 chain links regularly:
3
LOAD CHAIN
Visually check the chains for corrosion
and other signs of wear.
1
Begin to lower the load by slowly pulling
the hand chain
3
in the DN direction.
2
Caution!
Make sure that the mount-
ing point can withstand the load.
Make sure that the end stop
5
of the
load chain is securely in place.
2
Make sure that the latch
6
of the load-
ing hook
4
is closed, after the load sling
has been hooked to it.
2
Caution!
Make sure that the load
slings can carry the load.
Link ø
Link ø
Length 5 Links
New
Limit
New
Limit
6 mm
5.5 mm
90 mm
92.5 mm
Caution!
Make sure that the chain
hoist does not overheat.
Caution!
Make sure that the chain
hoist does not overheat.