www.patriotdocks.com
1/2” Bolts
Install Post Bracket
using two 1/2” bolts.
(included with Post
Bracket)
Loosen set bolts,
install 1
-
1/2” i.d.
schedule 40 support
pipes and add Pipe
Caps and either Foot
Plate bases or the
axle components.
Install Aluminum Jack
using four 3/8” bolts.
Add Drop Leg or Axle
attachment.
Install optional fender to
the Jack using two of the
alternate mounting holes.
Support Locations
Shore end of assembled dock
rests on and is supported by
the shoreline.
Optional Shore Ramps are
available.
Corners of patio sections
need supports.
Jack Supports
Pipe Supports