Operation  

© PAT Rev. 8 05/19/03 

191319_8.DOC 

23 

 
 

 

Having pressed SET, the X is 
displayed (without blinking) at this 
point.  
A blinking X at the boom tip indicates 
that the second point may be set to 
define the wall.  
Move the boom tip to other end of the 
virtual wall you want to set. 

 

 

 

Sets the second point to 
create a wall 

 

 

Exits the screen and deletes 
all virtual wall settings 
 
 

 

After pressing SET, an infinite virtual 
wall is defined. Now, three soft keys 
are available: 

 

 

 

Accepts the defined wall and 
exits 

 

 

Allows for further walls to be 
added 

 

 

Exits the screen and deletes 
all virtual wall settings 
 

 

After pressing SET, an X appears 
where the last point had been set, 
and a new wall may thus be added. 
Move the boom tip to the other end of 
the additional virtual wall you want to 
set. 
 

 

 

Sets the third point to create 
a second wall 

 

 

Exits the screen and deletes 
all virtual wall settings 
 
 

 
 

 

 

Содержание DS 350 / 1319 Graphic

Страница 1: ...www patamerica com PAT America Inc PAT Rev 8 05 19 03 191319_8 DOC LOAD MOMENT INDICATOR DS 350 1319 Graphic OPERATOR S MANUAL P N 050 350 191 319 REV 8 05 19 2003...

Страница 2: ...cument may be photocopied reproduced or translated to another language without the prior written consent of PAT America Inc PAT America Inc reserves proprietary rights to all drawings photos and the d...

Страница 3: ......

Страница 4: ...26 5 1 4 Radius Limitation 28 5 2 INFO CRANE CONFIGURATION 30 5 3 DISPLAY CONTRAST CONTROL 31 6 PRE OPERATION INSPECTION AND CALIBRATION VERIFICATION 32 6 1 MACHINES WITH ONLY A MAIN HOIST 32 6 2 MACH...

Страница 5: ......

Страница 6: ...device is not and shall not be a substitute for good operator judgment experience and use of accepted safe crane operating procedures The responsibility for the safe crane operation shall remain with...

Страница 7: ...movements such as hoist up telescope out and boom down will be stopped The fixed data regarding the crane such as capacity charts boom weights centers of gravity and dimensions are stored in memory ch...

Страница 8: ...ormation PAT Rev 8 05 19 03 191319_8 DOC 3 Fig 1 Components of the LMI system PAT DS 350 1 Anti Two Block switches 2 Pressure Transducers 3 Length Angle sensor 4 Operating console 5 Central Micro Proc...

Страница 9: ...logo If the system was turned off for more than two hours the setup configuration has to be entered after the system test Chapter 4 First the operating mode is determined by an interactive step by ste...

Страница 10: ...DENTIFICATION This unit contains a display and different controls which are described as follows Legend to Fig 2 1 LC Display Area 10 Button and Control Light INFO 2 Load Moment Limit Light 11 Button...

Страница 11: ...Operator s Manual DS 350 1319 PAT Rev 8 05 19 03 191319_8 DOC 6 Fig 2 Operating Console...

Страница 12: ...own Load Moment Prewarning Light The yellow LOAD MOMENT PRE WARNING LIGHT 3 will light up when the load on the crane reaches the defined prewarning area thus indicating that an overload condition is a...

Страница 13: ...actual load display when the boom radius is changed either by angle or length Button LIMITS Button to start the function program limit values For the proceeding please refer to Chapter 5 1 Button SELE...

Страница 14: ...pass A2B button 14 is pushed or The LMI cut off function is deactivated when the KEY SWITCH 13 is turned to position B and the By pass LMI button 15 is pushed KEY SWITCH 13 can be operated only by usi...

Страница 15: ...the anti two block switch is deactivated The Override Key Warning Light 5 flashes to indicate that the cut off function is deactivated Button By pass LMI This button can be operated only if key switch...

Страница 16: ...operation if the procedure has been completed and the inputs have been confirmed If the system is turned off for example during short breaks less than 2 hours all adjustments remain stored When turnin...

Страница 17: ...e following illustrations define the symbols appearing on the display during the setup procedure Not all symbols will be shown depending on the crane type and the answers to the questions Select inter...

Страница 18: ...or detailed symbol explanation of extensions please refer to Appendix A in this manual Setting the counterweight configuration If your crane is equipped with counterweight options please refer to Appe...

Страница 19: ...Of The Programming Procedure At the end of the procedure all inputs are represented once again in symbolic forms If inputs have been made the corresponding symbols are filled in black Quick Setting T...

Страница 20: ...ming procedure again Call LMI Programming Procedure Directly call function Quick Setting of the Reevings Note The direct call is impossible if the system has been turned off for more than 2 hours Inpu...

Страница 21: ...h the whole LMI setup procedure again Call LMI setup procedure Directly call function Hoist Line Selection Note The direct call is not possible if the system has been turned off for more than 2 hours...

Страница 22: ...ual crane configuration the system is ready for operation The display shows the LMI screen example for value representation reeving parts of line operation code number boom length tip height boom angl...

Страница 23: ...ts exceeded see Chapter 5 1 1 a Symbol work area definition continuously visible work area definition active blinking work area limits exceeded see Chapter 5 1 1 b Symbol height limitation continuousl...

Страница 24: ...by step user guidance Functions can be used individually or in combinations Exceeding a programmed limit triggers an audible and visual alarm Depending on the crane type not all functions listed below...

Страница 25: ...the corresponding figure to call the function Slewing angle limitation Maximum Minimum Slewing Angle Chapter 5 1 1 A Work Area Definition Virtual wall setup A wall is defined by a straight line betwee...

Страница 26: ...limit select right limit set delete Position boom to the required right limit value set present slewing angle as right limit delete right angle limit Display shows symbols and angle values of the prog...

Страница 27: ...perator can setup up to 5 virtual walls the first wall is defined by a straight line between two set points The second through fifth walls are created by one new point and the previously selected poin...

Страница 28: ...deletes all virtual wall settings After pressing SET an infinite virtual wall is defined Now three soft keys are available Accepts the defined wall and exits Allows for further walls to be added Exit...

Страница 29: ...S 350 1319 PAT Rev 8 05 19 03 191319_8 DOC 24 Upon pressing SET the second wall is created Accepts the defined walls and exits Allows for further walls to be added Exits the screen and deletes all vir...

Страница 30: ...e height limitation Call LIMIT Setting Press the corresponding figure to select function tip height limitation Press key set delete Move the tip to the required upper limit set present tip height as u...

Страница 31: ...corresponding figure to call function boom angle limitation set delete upper limit value Select limit selection upper boom angle limit set delete Luff up the boom the requested limit value set presen...

Страница 32: ...ection lower boom angle limit set delete Luff down boom to the required limit value set present boom angle as lower limit delete lower angle limit Display shows symbol with lower angle limit Display s...

Страница 33: ...etting Select the corresponding figure to call the function radius limitation set delete minimum radius Select limits select minimum radius limit set delete position boom at the required minimum radiu...

Страница 34: ...it Selection Maximum Radius Limit set delete Position boom to the required maximum radius value set present boom radius as maximum radius Delete maximum radius limit Display shows symbol with radius v...

Страница 35: ...system is ready for operation this function displays the system configuration Call Function Press key INFO The display shows the crane symbol representing the adjusted configuration marked black the...

Страница 36: ...attern is shown by means of which the display can be adjusted to the optimum contrast Use the functional keys to modify the contrast upon request Darken Display Brighten Display Confirm Setting Press...

Страница 37: ...fixed with a red lanyard at the anti two block switch described on pages 40 and 41 Then the weight shall be reattached to the boom extension anti two block switch Failure to re position the anti two...

Страница 38: ...etainer in Locking Position Fig 2 Retainer in Locking Position 3 Straighten the cable completely into the slot and release the cable 4 4 Turn the flag of the retainer for best visibility for the opera...

Страница 39: ...rane movements hoist up telescope out and boom down 1 Check the anti two block alarm light 4 and the audible alarm 12 by performing one of the following tests a By manually lifting the weight attached...

Страница 40: ...fore operating the crane 2 If the crane is equipped with a boom extension repeat the test procedure for the boom extension anti two block switch Check that the display of the main boom length agrees w...

Страница 41: ...MI Rated loads include the weight of the hook block slings and auxiliary load handling devices Their combined weights shall be subtracted from the listed load capacities as stated on the load capacity...

Страница 42: ...tion is worn on the length sensor cable or cable guides are damaged these parts shall be replaced 3 Check the anti two block limit switches for freedom of movement 4 The cable reel shall be under tens...

Страница 43: ...ctronic microprocessor shall be repaired by factory trained service personnel When these faults occur the competent service organization shall be contacted 9 2 MALFUNCTION TABLE Error Code Error E01 F...

Страница 44: ...given in the load capacity chart E03 Boom position is out of the permissible working area over front Move boom back to the permissible working area See lifting diagram in the load capacity charts E04...

Страница 45: ...he OM Fly is not completely retracted Extend the Center Mid Retract the OM Fly Check the OM Fly switch dig input 4 flashing tele Telescope is out of the permissible sequence Fully retract telescope EC...

Страница 46: ...se A frame boom extension offsetable A frame Fixed extension tele offsettable extension Fixed offsettable extension fixed jib Swingaway bifold with fly stowed on main boom swingaway with fly tele Swin...

Страница 47: ...unted auxiliary hoist structure with counterweight A with counterweight B only for cranes with auxiliary counterweight without auxiliary counterweight with auxiliary counterweight without counterweigh...

Страница 48: ...ion press the O K button to confirm and to proceed with console programming only for cranes with superstructure counterweight and front bumper counterweight configuration scroll up to the next pre pro...