Operator's Manual
DS 350 / 1319
© PAT Rev. 8 05/19/03
191319_8.DOC
16
4.3
QUICK HOIST LINE SELECTION
If, during the crane operation, the crane is switched over from front to rear hoist, the LMI system has to be
adjusted to this modification. This modification can be entered without having to go through the whole LMI setup
procedure again:
Call LMI setup procedure.
Directly call function "Hoist Line
Selection".
Note:
The direct call is not possible, if the
system has been turned off for
more than 2 hours.
Select hoist:
Front Hoist
Rear
Hoist
Confirm modification.
(Call up the function again if you
have selected the wrong winch by
mistake)
Note:
If a configuration is selected which is not available on the crane, the system will not accept the
selection and the display will indicate the error code E04
Содержание DS 350 / 1319 Graphic
Страница 3: ......
Страница 5: ......
Страница 11: ...Operator s Manual DS 350 1319 PAT Rev 8 05 19 03 191319_8 DOC 6 Fig 2 Operating Console...