Configuration Setup
© PAT Rev. 8 05/19/03
191319_8.DOC
13
Main Boom
Operation With Boom
Extensions
Aux. Boom Nose Operation
Main
Boom
Aux.
Boom
Nose
A-
Frame
Boom
Ext.
Fixed
Ext.
Fixed,
Offsettabl
e
Extension
Tele-
Offsettable
Extension
Fixed Jib
For detailed symbol explanation of extensions, please refer
to Appendix A in this manual.
•
Setting the counterweight configuration
If your crane is equipped with counterweight options, please
refer to Appendix B in this manual for detailed symbol
explanation of counterweight.
•
Setting The Hoist Configuration
Front Hoist
Rear
Hoist
•
Setting The Outrigger Configuration
On
Rubber
Outrigger Position 0%
Outrigger Position 50%
Outrigger Position 100%
Содержание DS 350 / 1319 Graphic
Страница 3: ......
Страница 5: ......
Страница 11: ...Operator s Manual DS 350 1319 PAT Rev 8 05 19 03 191319_8 DOC 6 Fig 2 Operating Console...