Load Reading
© PAT
Rev. - 12/18/00 // CSH.
190118_-.DOC
19
PREVIOUS PAGE
No Fault in cable or wiring.
Check force transducer for any visual damages.
Complete the force transducer calibration in operator's and calibration manual. If force
transducer can not be adjusted replace force transducer.
Refer to Procedure 5 and Drawing 1 or 7.
YES
END
Check linerider for any visual damages and check continuity in:
!
force transducer cable assembly (A to A, B to C, C to B, note the wiring of the
connector)
!
junction box (5 socket to 14 pin: A to D, B to C, and C to A)
!
cable reel, and cable assembly 14 pass connectors B to B, C to C, and D to D.
Refer to Drawing 1.
NO
Check power supply to force transducer by unplugging the cable assembly from the force transducer.
Measure voltage at the cable connection between A (+12/24v) and C (ground) at the connector.
Refer to Drawing 1 in Section 12.
Correct?
Содержание DS 350
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 29: ...Drawings PAT Rev 12 18 00 CSH 190118_ DOC 23 13 DRAWINGS 13 1 Electrical Wiring Drawing 1 Part 1 ...
Страница 30: ...Service Manual DS 350 Modular PAT Rev 12 18 00 CSH 190118_ DOC 24 Electrical Wiring Drawing 1 Part 2 ...
Страница 36: ...Service Manual DS 350 Modular PAT Rev 12 18 00 CSH 190118_ DOC 30 13 6 Console Connection Board Drawing 6 ...