background image

JINCHI05 REV E. 11/11/2014 

 

 
G

ENERAL 

G

UIDANCE

 

This  Appliance  has  been  certified  for  use  in  the 
countries stated on the cover. Installation in other 
countries  will  require  translated  instructions  and 
may also require modification to comply with local 
regulations.  
 
It is important that your stove is correctly installed 
and  operated  as  Parkray  Stoves  cannot  accept 
responsibility  for  any  fault  arising  through 
incorrect  installation,  use,  maintenance  or 
servicing. 
 
These  instructions  cover  the  basic  principles  to 
ensure  satisfactory  installation  of  the  stove, 
although  detail  may  need  slight  modification  to 
suit particular local site conditions.  
 
The installation must comply with current Building 
Regulations,  National  and  European  Standards, 
Local Authority Byelaws and other specifications or 
regulations  as  they  affect  the  installation  of  the 
appliance.  
 
The Building Regulations requirements may also be 
met by adopting the relevant recommendations in 
the current issues of British Standards BS 8303 and 
BS EN 15287-1. 
 
Only  use  approved  fuels  on  this  appliance. 
Information about this can be found on Page 7. 
 

This is a Domestic Appliance and must only be used 
in accordance with these instructions. 
Do  not  place  articles  that  are  affected  by  high 
temperatures  on,  or  near,  this  appliance.  Do  not 
place furniture or other items within 1 metre of the 
front  of  this  appliance.  See  the  note  on  material 
clearances on page 13. 
 
Extractor Fans and/or Cooker Hoods must not be 
installed  in  the  same  space  or  room  as  this  can 
cause the appliance to emit fumes into the room. 
 
Do  not  obstruct  the  ventilation  required  for  the 
safe use of this appliance. 
 

C

OMPETENT 

P

ERSONS 

S

CHEME

 

Parkray  Stoves  recommend  that  this  stove  is 
installed by a member of an accredited competent 
persons scheme e.g. HETAS. 
 
If  the  installer  is  not  a  member  of  a  competent 
person’s scheme, it is a legal requirement, in the 
UK, to notify your Local Building Control Officer in 
advance of any installation work starting. 
 

H

EALTH AND 

S

AFETY 

P

RECAUTIONS

 

Special  care  must  be  taken  when  installing  the 
stove such that the requirements of the Health and 
Safety at Work Act are met. 
 

H

ANDLING

 

This  appliance  is  very  heavy.  Adequate  facilities 
must  be  available  for  loading,  unloading  and  site 
handling.  

IMPORTANT INFORMATION 

PLEASE READ THESE INSTRUCTIONS PRIOR TO INSTALLATION AND OPERATION. 

 

KEEP THESE INSTRUCTIONS IN A SAFE PLACE FOR FUTURE REFERANCE AND SERVICING. 

 

THIS APPLIANCE WILL BECOME VERY HOT WHEN USED IN ACCORDANCE WITH THESE 

INSTRUCTIONS, CLEANBURN STOVES RECOMMEND THAT AN APPROVED GUARD IS USED TO 

PROTECT THE YOUNG, ELDERLY OR INFIRM FROM HARM. 

 

THE INSTALLER COMMISSIONING SHEET CAN BE FOUND ON THE BACK COVER. 

PLEASE ENSURE THAT IT IS COMPLETED PRIOR TO USE. 

Содержание Chevin Inset 5 MKII

Страница 1: ...1 JINCHI05 REV E 11 11 2014 Chevin Inset 5 MKII Model CVSCHI05FM Instructions for Installation Operation Maintenance Servicing Approved for use in the United Kingdom and the Republic of Ireland ...

Страница 2: ...ls Consumables are deemed to be Glass Seals Gaskets Grate Components Log Retainers Baffles and the surface finish of the appliance The Warranty will only be valid if the appliance is installed by an appropriately qualified engineer in accordance with the manufacturer s instructions and to the appropriate Building Regulations and or Local By Laws and serviced within 12 months of installation Parkra...

Страница 3: ... on or near this appliance Do not place furniture or other items within 1 metre of the front of this appliance See the note on material clearances on page 13 Extractor Fans and or Cooker Hoods must not be installed in the same space or room as this can cause the appliance to emit fumes into the room Do not obstruct the ventilation required for the safe use of this appliance COMPETENT PERSONS SCHEM...

Страница 4: ...times FUME EMISSION Properly installed and operated this appliance will not emit fumes Occasional fumes from de ashing and refueling may occur Persistent fume emission must not be tolerated This appliance should not be operated with the door open If fume emission does persist then the following action should be taken immediately Open Doors and windows to ventilate room Let the fire out or eject an...

Страница 5: ... in steadily and to give a long service life of the paint finish During this curing in process you may notice an unpleasant smell It is non toxic but for your comfort we would suggest that during this period you leave all doors and windows open AIR CONTROLS This stove has been designed to burn cleaner and more efficiently than a conventional wood burning stove If used correctly this stove will bur...

Страница 6: ...rols open Allow the fuel to reach a steady glow and build the fire up gradually Once you have a good fire established across the grate bed further fuel can be added as required LOADING THE APPLIANCE WOOD With a full load of wood the stove will need to be refuelled approximately once every hour and a half Wood can be stacked higher in the stove than solid mineral fuel but care must be taken that lo...

Страница 7: ...n and adjust the secondary air to give the desired heat output Never leave the stove unattended until you are certain that the flames are fully established Avoid refuelling on to a low fire bed as this may cause excessive smoke emission Ensure there are sufficient embers to ignite the new fuel rapidly Alternatively add some more kindling before adding larger pieces of firewood Do not add firewood ...

Страница 8: ...Scotland and Wales this power rests with Ministers in the devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obtained for use in smoke control areas have been authorised in Regulations and that appliances used to burn solid fuel in those areas other than authorised...

Страница 9: ...itable for use in a shared flue Read and follow the operating instructions Use only recommended fuels This stove has been designed and assembled so that it may be used to burn wood logs in a Smoke Control Area Find out if you are in a Smoke Control Area by contacting your Local Authority The Chevin Inset 5 has been fitted with a permanent bypass that prevents closure of the secondary air slider Re...

Страница 10: ...ting the chimney flue system Make provision to access the chimney flue system for cleaning and the removal of debris If there is no existing chimney then either a prefabricated block chimney in accordance with Building Regulations Approved Document J or a twin walled insulated stainless steel flue to BS4543 can be used These chimneys must be fitted in accordance with the manufacturer s instruction...

Страница 11: ... satisfactory installation of the stove although detail may need slight modification to suit particular local site conditions In all cases the installation must comply with current Building Regulations Local Authority Byelaws European and National Standards and other specifications or regulations as they affect the installation of the stove It should be noted that the Building Regulations requirem...

Страница 12: ...e way It is essential that all connections between the stove and chimney flue are sealed and made airtight Both the chimney and any flue pipe must be accessible for cleaning and if ANY parts of the chimney cannot be reached through the stove with baffle removed a soot door must be fitted in a suitable position to enable this to be done AIR SUPPLY Where necessary any air opening must be kept clear ...

Страница 13: ... retainer by lifting the right hand side until it will clear the opening and remove 3 Remove the catch bar front plate by lifting the right hand side until it will clear the opening and remove 4 Remove the grate bars by lifting them away from the cam bar and pulling forward out of the rear grate support The singular bars should be removed first noting their positions low or high leaving the two st...

Страница 14: ...ck 7 Unscrew the 2 M6 Screws and remove the Turbo Bars 8 Pull the top edge of the Lower Side Bricks forward and remove You will now be able to remove the Lower Rear Brick 9 You can now remove the Side Riddling Bars 10 Remove the cam bar by firstly sliding it to the right until the left hand end is clear of the hole 11 Then maneuver the free end into the void in the front left hand side of the Stov...

Страница 15: ... the hearth or paintwork on the stove and making sure that the 12mm rope seal is compressed forming a tight seal between the stove and fireplace 4 Drill into the existing fireback through the fixing holes in the body see below using a 6mm drill bit 5 Place the screws provided into the fixing holes and gently tighten until the stove feels secure 6 Fill the fixing holes with fire cement to form an a...

Страница 16: ...e appliance to heat up slowly ensuring that no products of combustion enter into the room When the appliance has reached working temperature open the Door and carry out a spillage test using a smoke match around the door opening If there is excessive spillage please allow the appliance to cool and then re check the chimney flue system and ventilation Do not run the stove at full output for at leas...

Страница 17: ... these can scratch the glass and make subsequent cleaning more difficult Wet logs on heated glass a badly aimed poker or heavy slamming of the doors could crack the glass panels The glass will not fracture from heat Should you need to replace a glass panel please ensure you purchase a new Gasket at the same time Please check periodically that the glass clips and screws have not become loose They s...

Страница 18: ...cleaner if required If the Gasket is torn or damaged we recommend that is replaced to ensure that no products of combustion enters the room when the appliance is used Brush down the outer surface and touch up the paint if necessary Burn the appliance at a low rate after maintenance to allow any new seals paint or glue cure properly The appliance may emit unpleasant odours during this process pleas...

Страница 19: ...ES AND STOVE CARE Single Door Assembly Single Door HCE09008 Glass Clip HHR08146 Glass Clip Screw FSJM05008SS Single Door Glass HCE09102 Single Door Gasket HCE09101 Door Handle Assembly TDI05ARRT011MB Rope Sealing Kit SCPCB900SDRSK REVC ...

Страница 20: ...Double Door Glass HCE09031 Double Door Gasket HCE09030 Right Hand Door HCE09009 Rope Sealing Kit SCPCB900DDRSK Glass Clip HHR08046 Glass Clip Screw FSJM05008SS Double Door Glass HCE09031 Double Door Gasket HCE09030 Door Handle Assembly TDI05ARRT012MB Door Handle Assembly Door Handle Boss AVI05010MB Door Handle Stainless AVA08020MB Hex Screw FSHM08050 ...

Страница 21: ...ars Side CNN05004 A B Upper CNS04013 Lower CNS04012 Ashpan HCN05ARRT033 Operating Tool HFR07040 Secondary Air Control Support Plate HCN05050 Slider Plate HH06086 Gasket HH06088 Slider Shaft HCN05016 Slider Knob HCE06059S Upper Side Brick HCN05073 A B Lower Side Brick HCN05071 A B Door Hinge HH06050 Hinge Pin FRRE08 1 75 Catch Bar Single Door HCN05ARRT0019 Double Door HCN05ARRT020 Primary Air Contr...

Страница 22: ...de Appliance Description Serial Number COMMISSIONING CHECK Complete Sign YES NO Does the chimney flue system meet the appropriate standard Has the chimney flue system been swept and passed the soundness test Has this appliance passed the flue draught test Please write down the flue draught reading Has this appliance passed the smoke test Has this appliance passed the spillage test Have you explain...

Страница 23: ...Servicing Company Engineer Signature 9th Service Date of Service Date of next Service Servicing Company Engineer Signature 2nd Service Date of Service Date of next Service Servicing Company Engineer Signature 4th Service Date of Service Date of next Service Servicing Company Engineer Signature 6th Service Date of Service Date of next Service Servicing Company Engineer Signature 8th Service Date of...

Страница 24: ...24 JINCHI05 REV E 11 11 2014 ...

Отзывы: