192-011006N8 PSD1 Installation Guide
192-011006N8 2019-07
09.10.19 09:27
13 (109)
•
Provide protection and/or additional safety systems in order to prevent personal
injury and material damage. Always care for sufficient ventilation.
•
All control and signal terminals guaranty safe extra-low voltages (SELV),
i.e. they are protected by a double isolation. Make sure the complete external
wiring is approved for the highest system voltage.
•
The user is responsible for protective covers and/or additional safety measures in
order to prevent damages to persons and electric accidents.
2.8.6.
Responsibility
Fitters and operators of any machine or systems are responsible for ensuring that,
in case of failure of a device or component, the drive and therefore the machine or
system is rendered safe. In doing so, people must not be endangered.
The here-in described technical data, processes and circuits are merely a general
guidance and may not be suitable for the user's specified application. We cannot
guaranty the suitability for certain applications of the device described in this
manual.
2.9
Warranty conditions
•
The device must not be opened.
•
No changes may be made to the device; except for the changes described in the
manual.
•
Make connections to the inputs, outputs and interfaces only in the manner
described in the manual.
•
Fix the devices according to the
mounting instructions.
(see page 27)
We cannot provide any guarantee for other mounting methods.
Note on exchange of options
Device options must be exchanged in the factory to ensure hardware and software
compatibility.
•
When installing the device, make sure the heat dissipators of the device receive
sufficient air and respect the recommended mounting distances of the devices
with integrated ventilator fans in order to ensure free circulation of the cooling air.
•
Make sure that the mounting plate is not exposed to external temperature
influences.
2.10
Conditions of utilization
In this chapter you can read about:
•
Conditions of utilization for CE-conform operation .................................................................... 13
•
CE declaration of conformity PSD1-M ...................................................................................... 16
•
CE declaration of conformity PSD1-S ....................................................................................... 17
•
Conditions of utilization for the cUL certification of PSD1-M ...................................................... 18
•
Conditions of utilization for the cUL certification of PSD1-S ...................................................... 21
•
Current on the mains PE (leakage current) ............................................................................... 24
•
Supply networks ....................................................................................................................... 24
2.10.1.
Conditions of utilization for CE-conform operation
2.10.1.1
- Industry and trade -
- Industry and trade -
The EC guidelines for electromagnetic compatibility 2014/30/EU and for electrical
operating devices for utilization within certain voltage limits 2014/35/EU are fulfilled
when the following boundary conditions are observed:
Operation of devices only in the state in which they are delivered.