18
5 Servicing
5.1
Cleaning
Clean the equipment with a damp cloth only and avoid excessive moisture around any electrical sockets. If required you may use a mild
detergent, however do not use abrasives or solvents as they may damage the warning labels on the equipment.
5.2
Service Intervals
- Check
– Replace
5.3
Service Kits
Please refer to diagram A8 in Annex A.
Description Of Maintenance Required
Typical Recommended Maintenance Interval
Component
Operation
Dail
y
2000 H
o
u
rs
(3
-mo
nt
h)
4000 H
o
u
rs
(6
-mo
nt
h)
8000 H
o
u
rs
(1
2-mo
nt
h)
16000 Hou
rs
(2
4-mo
nt
h)
Generator
Check status indicators located on the control panel.
System
Check inlet air quality
Generator
Check for air leaks
Generator
Check pressure gauges during purging for excessive back pressure
Generator
Check condition of electrical supply cables and conduits
Generator
Check cyclic operation
Generator
Replace active exhaust silencers
Recommended Service A
Filtration
Replace dust and control air filters.
Recommended Service B
Generator
Replace/Calibrate oxygen sensor
Recommended Service C
Generator
Replace/Service valves
Recommended Service D
Service Kit
Description
Kit No.
A – Silencer Service
Exhaust Silencer Kit
608620090
B – Filter Service
Filter Element Kit
020AR
C – O
2
Cell Service
PPM O
2
Cell Kit
606500002
% O
2
Cell Kit
606500003
D – Valve Service
PPM Valve Overhaul Kit (without
equalisation valve)
606500004
% Valve Overhaul (with equalisation valve)
606500005
The valve overhaul (Service D) and all other repair and calibration work should be undertaken by a Parker domnick
hunter trained, qualified and approved engineer.
Содержание MAXIGAS MX104
Страница 2: ......