Parker Matrx Digital MDM Скачать руководство пользователя страница 6

MDM AS SUPPLIED WITH NITROUS OXIDE - OXYGEN SCAVENGER 

 

 

 
The following assembly procedure is common for all MDM models supplied with the dental scavenger 
(see fig 2): 
 

1.  Position breathing bag as shown and slide opening in breathing bag over outside diameter of bag 

mount. 

 

2.  Insert fresh gas connector into breathing tube connector. 

 

3.  Refer to scavenging nasal inhaler instructions for methods of connecting vacuum shut-off valve. 

 

Содержание Matrx Digital MDM

Страница 1: ...REF 10049600 Rev M Parker Hannifin Corporation Porter Instrument Division 245 Township Line Road Hatfield PA 19440 USA...

Страница 2: ......

Страница 3: ...EMBLY 2 CONNECTION AND ACTIVATION OF GAS SUPPLY TO MACHINE 9 ASSEMBLY OF E SIZE CYLINDERS TO PORTABLE UNITS 11 WITH CYLINDER MOUNTS SPECIFICATIONS 14 PRE OPERATION 19 CROSS PIPELINE TEST 21 FUNCTIONAL...

Страница 4: ...t to change WITHOUT NOTICE MATRX PARKER should be contacted for current information We cannot over stress the importance of the user performing their own test independent of the dealer or contractor t...

Страница 5: ...with conventional rubber goods see fig 1 1 Position breathing bag as shown and slide opening in breathing bag over outside diameter of bag mount 2 Slide one end of 40 breathing tube over outside diam...

Страница 6: ...odels supplied with the dental scavenger see fig 2 1 Position breathing bag as shown and slide opening in breathing bag over outside diameter of bag mount 2 Insert fresh gas connector into breathing t...

Страница 7: ...rear top of the head and assemble the mounting bracket to the rear top of the analgesia head by aligning the bracket with the bevel side to the head and the 10 32 tapped holes in the head with the scr...

Страница 8: ...ing see fig 4 B Concrete Wall Mounting Note Mounting hardware is not supplied with the mount 1 Drill hole in concrete wall as instructed by anchor manufacturer Drive in anchor Insert screw through was...

Страница 9: ...rmly rotate the nut clockwise looking towards the bottom of the head firmly until it stops against the MDM D Slide the tapered nose of the pole mount assembly into the bore of spider stand until it co...

Страница 10: ...8 CONNECTION AND ACTIVATION OF GAS SUPPLY TO MACHINE...

Страница 11: ...re accomplished by using color coded and mechanically indexed hose assemblies CAUTION 1 Only oxygen hoses can be used for oxygen connections 2 Only nitrous oxide hoses can be used for nitrous oxide co...

Страница 12: ...en to hand tight and then finish tighten with 7 8 open end wrench just enough to prevent leaks Do not over tighten 2 In the same fashion connect the oxygen hose to the male oxygen fitting see fig 19 F...

Страница 13: ...ted on the face of the cylinder yoke and holes accurately located on the cylinder shut off valve such that only cylinders of a specific gas will fit the cylinder yoke for that specific gas See Figures...

Страница 14: ...the cylinder seal See Figure 23 4 Locate the E cylinder directly underneath the cylinder with the cylinder shut off valve located towards the cylinder yoke and such that the face of the cylinder valve...

Страница 15: ...13 NOTE Close the valve stem when the cylinder is not in use This completes the assembly of the analgesia unit SPECIFICATIONS A Standard MDM Flowmeter Heads See fig 26...

Страница 16: ...calibration As indicated on individual flowtubes Total Flow Range 2 to 20 LPM at 50 to 55 PSIG supply pressure and dial mixture set at 50 As indicated on individual flowtubes Total Flow Variation with...

Страница 17: ...15 Estimated Weight 7 Pounds MDM SPECIFICATION DIAGRAMS cont B MDM PORTABLE STAND MOUNTED UNIT...

Страница 18: ...16 MDM SPECIFICATION DIAGRAMS cont C MDM WALL MOUNTED...

Страница 19: ...17 Figure 28 MDM SPECIFICATION DIAGRAMS cont D MDM UNDER COUNTER MOUNTED...

Страница 20: ...18 PRE OPERATION A Rotate flow control valve fully counter clockwise See fig 30 Rotate mixture dial to 100 position...

Страница 21: ...manifold systems utilizing quick connect fittings the analgesia unit can be moved from station to station without shutting off the medical gas source once pre operation and functional tests are comple...

Страница 22: ...es located on regulators For a full tank of oxygen the pressure should be about 2000 PSIG For a full tank of nitrous oxide the pressure should be about 750 PSIG c The regulators are factory set to 50...

Страница 23: ...IPELINE TEST Nitrous Oxide and Oxygen Systems Only The customer is advised to refer to the following test procedures as an additional step to assure that the gas lines have not been crossed during ins...

Страница 24: ...G Verify the following All primary nitrous oxide gauges read pressure All secondary nitrous oxide gauges read 50 to 55 PSIG All oxygen gauges read O H Test for crossed gas lines by connecting an index...

Страница 25: ...ng tests will require the analgesia unit to be returned for service These tests must be conducted periodically to insure that your analgesia unit is performing optimally see fig 30 1 Machine Turn On T...

Страница 26: ...he breathing tube connector Exhaled air must not pass through breathing connector 7 Air Inlet Valve Test Temporarily plug breathing bag mount and inhale through breathing tube connector Room air must...

Страница 27: ...f Oxygen Until Determined Ratio is reached F If Oxygen is Required Press Oxygen Flush Button G To Remove Patient from Conscious Sedation Set Mixture Valve to 100 Oxygen H When Procedure is Completed S...

Страница 28: ...oduct indicates compliance with the Medical Device Directive of the European Community A Declaration of Conformity in accordance with the Directive has been made and is on file European Communities sh...

Отзывы: