6 Maintenance
a) The machine is designed and built to guarantee continuous
operation; however, the life of its components depends on
the maintenance performed.
b)
Z
When requesting assistance or spare parts, identify the
machine (model and serial number) by reading the data plate
located on the unit.
c) Circuits containing 5t < xx < 50t of CO2 are checked to
identify leaks at least once a year.
Circuits containing 50t < xx < 500t di CO2 are checked
to identify leaks at least once every six months. ((EU) No.
517/2014 art. 4.3.a, 4.3.b).
d) For machines containing 5t CO2 ore more, the operator
must keep a record stating the quantity and type of refriger-
ant used, an quantities added and that recovered during
maintenance operations, repairs and fi nal disposal ((EU) No.
517/2014 art. 6).
6.1 General instructions
!
Before performing any maintenance, make sure the power
to the refrigerator is disconnected.
Y
Always use the Manufacturer’s original spare parts:
otherwise the Manufacturer is relieved of all liability regarding
machine malfunctioning.
Y
In case of refrigerant leakage, contact qualifi ed and author-
ized personnel.
Y
The Schrader valve must only be used in case of machine
malfunction: otherwise any damage caused by incorrect refrig-
erant charging will not be covered by the warranty.
6.2 Preventive maintenance
To guarantee lasting maximum chiller effi ciency and reliability,
carry out:
a)
Z
every 4 months -
clean the condenser fi ns and make
sure compressor electrical absorption is within the dataplate
values;
b)
Z
yearly - W
version: in case of encrustations inside the
condenser, introduce and circulate a specifi c detergent liquid.
b)
Z
Every 3 years -
installation of kit for maintenance every
3 years. (par.7.4)
a)
kit for maintenance every 3 years;
b)
service kit;
1. compressor
kit;
2. fan
kit;
c)
individual spare parts.
6.3 Refrigerant
Z
Charging: any damage caused by incorrect charging car-
ried out by unauthorized personnel will not be covered by the
warranty.
Y
The equipment contains fl uorinated greenhouse gases.
At normal temperature and pressure, the R407C refrigerant is a
colourless gas classifi ed in SAFETY GROUP A1 - EN378 (group
2 fl uid according to Directive PED 2014/68/EU);
GWP (Global Warming Potential) = 1774.
!
In case of refrigerant leakage, air the room.
6.4 Dismantling
The refrigerant and the lubricating oil contained in the circuit
must be recovered in conformity with current local environmen-
tal regulations.
The refrigerant fl uid is recovered before fi nal scrapping of the
equipment ((EU) No. 517/2014 art.8).
%
Recycling
Disposal
frame and panels
steel/epoxy resin polyester
pipes/collectors
copper/aluminium/carbon steel
pipe insulation
NBR rubber
compressor
steel/copper/aluminium/oil
condensator
steel/copper/aluminium
fan
aluminium
refrigerant
R407C (HFC)
valve
brass/copper
electrical cable
copper/PVC
Equipment containing electrical components must
be disposed separately collected with electrical
and electronic waste according to local and cur-
rently legislation.
Содержание Hyperchill ICE150
Страница 2: ......
Страница 63: ...Appendice Anhang Ap ndice Appendix Appendice Anexo...
Страница 84: ...7 8 Circuit diagram ICE150 230 A 20 ICE150 230 DP NP LAT ICE230 A1...
Страница 85: ...7 8 Circuit diagram ICE150 183 W 21 ICE150 230 DP NP A1...
Страница 86: ...7 9 Wiring diagram Standard 22 ICE150 230 Sheet 1 of 12...
Страница 87: ...7 9 Wiring diagram Standard 23 ICE150 230 Sheet 2 of 12...
Страница 88: ...7 9 Wiring diagram Standard 24 ICE150 230 Sheet 3 of 12...
Страница 89: ...7 9 Wiring diagram Standard 25 ICE150 230 Sheet 4 of 12...
Страница 90: ...7 9 Wiring diagram Standard 26 ICE150 230 Sheet 5 of 12...
Страница 91: ...7 9 Wiring diagram Standard 27 ICE150 230 Sheet 6 of 12...
Страница 92: ...7 9 Wiring diagram Standard 28 ICE150 230 Sheet 7 of 12...
Страница 93: ...7 9 Wiring diagram Standard 29 ICE150 230 Sheet 8 of 12...
Страница 94: ...7 9 Wiring diagram Standard 30 ICE150 230 Sheet 9 of 12...
Страница 95: ...7 9 Wiring diagram Standard 31 ICE150 230 Sheet 10 of 12...
Страница 96: ...7 9 Wiring diagram Standard 32 ICE150 230 Sheet 11 of 12...
Страница 97: ...7 9 Wiring diagram Standard 33 ICE150 230 Sheet 12 of 12...
Страница 98: ...7 9 Wiring diagram L2 option 34 ICE150 230 Sheet 1 of 14...
Страница 99: ...7 9 Wiring diagram L2 option 35 ICE150 230 Sheet 2 of 14...
Страница 100: ...7 9 Wiring diagram L2 option 36 ICE150 230 Sheet 3 of 14...
Страница 101: ...7 9 Wiring diagram L2 option 37 ICE150 230 Sheet 4 of 14...
Страница 102: ...7 9 Wiring diagram L2 option 38 ICE150 230 Sheet 5 of 14...
Страница 103: ...7 9 Wiring diagram L2 option 39 ICE150 230 Sheet 6 of 14...
Страница 104: ...7 9 Wiring diagram L2 option 40 ICE150 230 Sheet 7 of 14...
Страница 105: ...7 9 Wiring diagram L2 option 41 ICE150 230 Sheet 8 of 14...
Страница 106: ...7 9 Wiring diagram L2 option 42 ICE150 230 Sheet 9 of 14...
Страница 107: ...7 9 Wiring diagram ICE150 183 A C W 43 ICE150 230 Sheet 10 of 14...
Страница 108: ...7 9 Wiring diagram ICE150 183 A C W 44 ICE150 230 Sheet 11 of 14...
Страница 109: ...7 9 Wiring diagram ICE150 183 A C W 45 ICE150 230 Sheet 12 of 14...
Страница 110: ...NE150 183 46 ICE150 230 Sheet 13 of 14...
Страница 111: ...7 9 Wiring diagram ICE150 183 A C W 47 ICE150 230 Sheet 14 of 14...
Страница 112: ......
Страница 113: ......