Bulletin 61-60
3
Installation Diagrams:
Column/Standpipe Installations
20mA
4mA
Min.
50mm
(2”)
13mm
(
1
⁄
2
”)
210mm (8.25”)
+
Probe Length
Min.
50mm
(2”)
Remember clearance is required for
replacement of liquid level transmitter
probe, if applicable.
10º
Min.
25mm
(1”)
Receiver
Min.
75mm
(3”)
Min.
100mm
(4”)
Column
Cap
Sight Glass
Pipe
Column
Weld
Weld
Liquid level
Switch
Notes:
Column caps are only available in 75mm and
100mm (3” and 4”) diameters.
Mounting Instruction
It is required to use Teflon tape/paste on NPT connections or
sealing ring on BSP connections.
Add Teflon tape/paste to the threads.
Mount the liquid level transmitter on the vessel and tighten to a
torque specificaton of 80 - 150 Nm (59 - 110 ft. lb.)