Installation
BSP-MT 10-95/D3
19
Connect piping
In order to ensure that the dryer operates optimally, the dryer must be assembled into the
compressed air system free of all stresses.
Ensure before connection that all infeed and outfeed compressed air lines and valves are
clean and undamaged.
Check the bolt connections and retighten if necessary, as they could have worked loose
during transportation.
Remove plugs on the pressure inlet and outlet.
All piping must be free from any stress and tension whatever!
Pipes subject to stress may burst due to the load placed on them during opera-
tion. This may cause damage to property and personal injury.
Use steel pipes to connect the dryer to the compressed air system.
The following fi gure shows an installation example.
Compressed air system
Item.
Component
Example of an installation with bypass line
1
Entry, humid air
2
Compressed air inlet
valve, owner end
3
Upstream fi lter
4
Dryer
5
Downstream fi lter
6
Compressed air outlet
valve, owner end
7
Outlet, dry air
The connection lines for the upstream fi lter (3) are to be installed at a slight incline in the
direction of the upstream fi lter.
One shutdown valve each (2, 6) is to be installed at the compressed air inlet and outlet
ends of the dryer.
Содержание BSP-MT 10/D3
Страница 2: ......
Страница 53: ...EN User Manual Annex with technical documentation BSP MT 10 95 D3 51 Regeneration in B1 and adsorption in B2 ...
Страница 56: ...EN User Manual 54 BSP MT 10 95 D3 ...
Страница 57: ...EN User Manual BSP MT 10 95 D3 55 ...
Страница 58: ...EN User Manual 56 BSP MT 10 95 D3 ...
Страница 59: ......