![Parker Zander BSP-MT 10-95/D3 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/parker-zander/bsp-mt-10-95-d3/bsp-mt-10-95-d3_operating-manual_756523014.webp)
EN
| User Manual
Transportation, installation and storage
12
BSP-MT 10-95/D3
Installing the dryer
Caution!
Always use the lifting lugs at the top of the tank to lift the dryer. Use a lifting
beam with a suitable spacing for this purpose. This will ensure the tanks can-
not come in contact with the upper pipe bridge and thus damage it.
Remove the packaging of the dryer.
Attach suitable lifting gear to the transport lugs of the vessels (see fi gure I).
Raise the dryer (see fi gure II) and remove the transportation pallet.
Place the dryer at its installation site.
I: Transport lugs on pressure vessel
II: Installing by crane
Anchoring the dryer
Use suitable attachment material to anchor the dryer to the fl oor.
In the case of vibrating fl oors: place the dryer on suitable vibration dampers.
Содержание BSP-MT 10-95/D3
Страница 2: ......
Страница 53: ...EN User Manual Annex with technical documentation BSP MT 10 95 D3 51 Regeneration in B1 and adsorption in B2 ...
Страница 54: ...EN User Manual Annex with technical documentation 52 BSP MT 10 95 D3 Flow diagram ...
Страница 55: ...EN User Manual Annex with technical documentation BSP MT 10 95 D3 53 Dimensional drawing ...
Страница 56: ...EN User Manual 54 BSP MT 10 95 D3 ...
Страница 57: ...EN User Manual BSP MT 10 95 D3 55 ...
Страница 58: ...EN User Manual 56 BSP MT 10 95 D3 ...
Страница 59: ......