EN
| User Manual
Installation
20
BSP-MT
1-8/D3
Installing the electrical connection
Warning against electrical voltage
Only qualifi ed specialist personnel may carry out work on the electrical system!
Installing the supply cable
The components of the dryer have been connected to the control cabinet at the factory. You
only need to connect the control cabinet to the electrical supply cable.
The switchbox is provided with a connector where electrical power must be connected.
Ensure that the cross-section of the electrical supply cable corresponds to the power
rating of the dryer and the electrical voltage provided by the customer.
Make the electrical supply cable to the dryer voltage-free.
Secure the electrical supply cable to the dryer against switch-on.
Undo bolt (1) on the connector and withdraw
connector with seal from the switchbox.
Use a suitable tool to remove the terminal
block from the connection box.
Undo the PG union and pull the cable th-
rough the aperture (3). The exposed phase ends
should not be longer than 35 mm max.
Now make the cable connection as follows:
— .. Earth to terminal PE
— .. L1 to terminal 1
— .. N to terminal 2
Terminal 3 is not used.
Connect electrical cable to device
adapter
Fit terminal block into the connector and use bolt to remount the connector with seal on
the switchbox.
In all phases the dryer must be protected against short circuits by means of fuses.
In order to relief cable strain, re-tighten the PG union.
Содержание BSP-MT 1-8/D3
Страница 2: ......
Страница 54: ...EN User Manual Annex with technical documentation 52 BSP MT 1 8 D3 Regeneration in B1 and adsorption in B2 ...
Страница 57: ......