T6T VHF 100 W Transmitter
Page 6
Maintenance
Back to Transmitter
Main Page
AC and DC Change-over Check
If both ac and dc input supplies are connected to the transmitter, carry out the following check:
(1)
Confirm that both ac and dc supplies are connected to the transmitter. Ensure that the rear panel
Power switch is set to the I (on) position.
(2)
Confirm that the front panel Ready indicator is lit, the LCD is illuminated, and the transmitter is
operational.
(3)
Switch off the ac supply from its source.
(4)
Check that the transmitter continues to operate correctly from the dc supply. If accessed, the
front panel BIT screen will show AC Supply as off, and DC Supply as on. The value of the dc
supply is also shown.
Содержание T6T
Страница 1: ...T6T VHF 100 W Transmitter User Documentation ...
Страница 10: ...Back to Transmitter Main Page Intentionally Blank ...
Страница 54: ...Back to Transmitter Main Page Intentionally Blank ...
Страница 110: ...Back to Transmitter Main Page Fig 8 Processor Module Removal and Refitting Detail CN6 CN5 CN4 CN3 CN1 ...
Страница 111: ...Back to Transmitter Main Page Fig 9 PSU Regulation Module Removal and Refitting Detail CN3 CN1 CN4 CN5 CN2 CN6 CN7 ...
Страница 112: ...Back to Transmitter Main Page Fig 10 PA Control Module Removal and Refitting Detail CN4 CN3 CN6 CN1 CN2 CN5 behind box ...
Страница 115: ...Back to Transmitter Main Page Fig 13 PA Modules Removal and Refitting Detail PA 1 PA 2 ...
Страница 116: ...Back to Transmitter Main Page Fig 14 Front Panel and Front Panel Assembly PCB Removal and Refitting Detail ...
Страница 118: ...Back to Transmitter Main Page Intentionally Blank ...