T6T VHF 100 W Transmitter
Page 3
Maintenance
Back to Transmitter
Main Page
Scheduled Maintenance
Park Air recommends that scheduled maintenance is carried out at twelve-monthly intervals. Scheduled
maintenance comprises the following checks:
Cleaning and Checking Security of Connectors
Remove all dust and dirt from the equipment exterior using a lint-free cloth and camel hair brush. Check
all external connections are secure and free from damage.
Setting the Transmitter Internal Reference Frequency
To set the transmitter internal reference frequency, use the following procedure. Note that references to
the switch in the procedure mean the Scroll/Select switch.
(6)
Turn the switch clockwise until Exit is highlighted, then press the switch. You are returned to the
Main screen.
(7)
Disconnect the frequency counter.
Number
Check
Tools/Test Equipment Required
1
Ensure the equipment is clean and that external
connectors are securely fitted.
Camel hair brush/clean lint-free
cloths
2
Check and reset (if required) the transmitter’s
internal frequency reference.
VHF frequency counter
3
Perform a BIT interruptive test.
4
Perform an ac and dc change-over check (if both
supplies are connected).
Control Screen
Settings Screen
F r
e q u e n c
y
C h a n n e l
S e t
t
i
n g s
E x
i
t
B a n d
E d g e s
R e f
F r
e q
5 0 .
0 %
B a c
k
l
i
g h t
0 3 0 s
E x
i
t
< <
> >
(1)
Ensure the transmitter does not have
an offset.
(2)
Connect a frequency counter to the
front panel Reference connector.
(3)
From the Main screen, press the switch
to display the Control screen. Turn the
switch until Settings is highlighted.
Press the switch.
(4)
Ensure the Settings screen is
displayed. Turn the switch until Ref
Freq is highlighted, then press the
switch.
(5)
With Ref Freq selected turn the switch
clockwise or anti-clockwise until the
frequency counter reads
20.950000 MHz ±10 Hz, then press the
switch.
Содержание T6T
Страница 1: ...T6T VHF 100 W Transmitter User Documentation ...
Страница 10: ...Back to Transmitter Main Page Intentionally Blank ...
Страница 54: ...Back to Transmitter Main Page Intentionally Blank ...
Страница 110: ...Back to Transmitter Main Page Fig 8 Processor Module Removal and Refitting Detail CN6 CN5 CN4 CN3 CN1 ...
Страница 111: ...Back to Transmitter Main Page Fig 9 PSU Regulation Module Removal and Refitting Detail CN3 CN1 CN4 CN5 CN2 CN6 CN7 ...
Страница 112: ...Back to Transmitter Main Page Fig 10 PA Control Module Removal and Refitting Detail CN4 CN3 CN6 CN1 CN2 CN5 behind box ...
Страница 115: ...Back to Transmitter Main Page Fig 13 PA Modules Removal and Refitting Detail PA 1 PA 2 ...
Страница 116: ...Back to Transmitter Main Page Fig 14 Front Panel and Front Panel Assembly PCB Removal and Refitting Detail ...
Страница 118: ...Back to Transmitter Main Page Intentionally Blank ...