background image

6

CONNECTING ULTRA UV2 UNIT TO POWER SOURCE

FOR 120V CORDED UNITS
1.  Reinstall the Bonnet.
2.  Connect the corded plug into the previously used GFCI receptible.
3.  Pow er on the pump and ensure the system is functional. 

• If not functional test the unit per a typical warranty call.

1.   Install the conduit into the seal-tight connector. 

Replace the conduit if it is too short. Lift the 
grommet from the mounting plate and feed the 
two power wires & and ground wire. Replace 
wires if any are too short. Use the supplied 
tube of silicone and cover the wires at the 
junction of the conduit connector. Reinstall 
the grommet to the mounting plate.

3.   Cut the ground wire to length and attach 

an 18-22 AWG ring terminal. Remove 
the nut from the left ground post. Place 
the ring terminal over the ground post. 
Reattach the nut.

4.   Reinstall the Bonnet.
5.   Turn on the breaker for the Ultra UV2 unit.
6.   Power on the pump and ensure the system 

is functional.

• If not functional test the unit per a typical 
warranty call.

2.   Attach one power leg (most likely black) to 

the upper right position of the terminal block. 
Attach one power leg (most likely white) to 
the lower right position of the terminal block. 
• NOTE: The terminal block is sized to 
accept a spade terminal for 18-22AWG 
wire.

FOR 230V HARD-WIRED UNITS

Содержание Ultra UV2

Страница 1: ...ALLATION GUIDE IN ITS ENTIRETY AND HEED ALL SAFETY INFORMATION Failure to follow these instructions and warnings can result in DEATH OR SERIOUS INJURY DANGER CAUTION indicates a hazardous situation wh...

Страница 2: ...be re installed 5 Us ing ABS cement install the supplied blanking plugs unions to the new replacement tank Be sure to match the placement of fittings on the old tank Note the orientation of the incomi...

Страница 3: ...Remove metal disk from the old quartz tube and place it gently into the new quartz tube Note Dropping metal disk into quartz tube may cause damage 6 Install the lamps into the quartz tube in the new...

Страница 4: ...and pull gently until wire is disconnected 2 Remove ballast s from the old tank and install onto the integrated brackets on the new tank with the wire input side facing the pressure switch 3 Disconne...

Страница 5: ...wires behind terminal block 4 Using one of the green ground wires D connect it to the right ground post Make sure the flat washer is underneath the ring terminal of the green wire 5 Connect all the c...

Страница 6: ...wires at the junction of the conduit connector Reinstall the grommet to the mounting plate 3 Cut the ground wire to length and attach an 18 22 AWG ring terminal Remove the nut from the left ground po...

Страница 7: ...s Y connector quartz tube quartz tube o ring compression washer 2 union kit 6 blanking plugs 2 005 422 3000 00 Ultra UV Tank Replacement 120V Includes Wires Y connector quartz tube quartz tube o ring...

Страница 8: ...8...

Отзывы: