13
The pages in the following section of this manual should be copied and used when training staff to operate the Paramount Spiral
Mixer. It is recommended that the competency assessment checklists be completed, signed, and a copy kept in the personnel files
for future reference.
• Competency check lists are copied and completed as part of the training of staff.
• Correct training of staff to the required competency expectations.
•
The verification section of the competency check list is signed off.
• A copy of the completed and signed competency check list is placed in personnel records as evidence of operator
competence.