manualshive.com logo in svg
background image

Before installing the mixer, check that the available electrical supply match that 
of the mixer as stated on the mixer’s rating plate. 

Installation

 

Unpacking 

 

Immediately after unpacking the mixer, check it for possible shipping damage.  If this machine is 

found to be damaged after unpacking, save the packaging material and contact the carrier within 

one day of delivery. 

 
 

Location 

 

Place the mixer in its operating location - this should be a sturdy level surface.  There should be 

adequate space around the mixer for the user to operate the controls and install and remove the 
bowl. 

 

Holes are provided in the base to permanently secure the mixer, although this not necessary in  

normal installations. 

 

Floor models must be leveled front-back and side-to-side by sliding shims under the legs as  

required. 

 
 

Electrical Connection 

 

The supply cord on this machine is provided with a three-pin 13A fused and earthed plug.  It is  

imperative that the outlet to which this plug is connected is properly earthed (grounded). 

 

Prior to installation, test the electrical service to assure it agrees with the specifications on the  

machine data plate located on the rear side of the pedestal. 

 

Permissible voltage fluctuation is ± 10% of nominal voltage. 

 

Components having adjustments protected (e.g. paint sealed) by the manufacturer, are 

only allowed to be adjusted by an authorised service agent.   

 
 

Rotation 

To start the motor, push the 'ON' button.  The speed selector handle must be on one of the  

numbers indicating a speed and not located between the numbers. 

Figure 1 

Содержание BM60

Страница 1: ...1 BM60 Planetary Mixer INSTALLATION OPERATION MANUAL F26295 6...

Страница 2: ...vice tel 1800 335 315 fax 1800 350 281 CANADA Serve Canada Web www servecanada com E Mail info servecanada com Sales tel 800 551 8795 Toll Free Service tel 800 263 1455 Toll Free NEW ZEALAND Moffat Li...

Страница 3: ...n 5 Cleaning and Maintenance 7 Fault Finding 8 Competency Checklists 9 Operations Competency Checklist Daily Cleaning Competency Checklist Risk Assessment 12 Replacement Parts List 13 Wiring Diagrams...

Страница 4: ...a hardened steel worm wheel A stainless steel safety guard and electronic timer are available on all models With proper operation and maintenance this mixer will give you years of service and obtain t...

Страница 5: ...hen the desired time has elapsed Emergency Stop Button Located on the Control Panel on the right hand side of the machine Pressing this button will stop all movement of the machine The Emergency Stop...

Страница 6: ...ssary in normal installations Floor models must be leveled front back and side to side by sliding shims under the legs as required Electrical Connection The supply cord on this machine is provided wit...

Страница 7: ...s elapsed In timed operation if the machine is shut off before the preset time has elapsed the electronic TIMER does not continue To restart mixing the electronic TIMER has to be reset then depress th...

Страница 8: ...bottom Agitators When placing an agitator on the agitator shaft lower the bowl push the agitator up onto the shaft and turn the agitator until the drive pin on the shaft reaches L shaped slot in the a...

Страница 9: ...ard should be removed periodically and wiped clean Maintenance Guidelines The Transmission Case and Planetary Mechanism should be inspected weekly for leaks damage etc Should it become necessary to re...

Страница 10: ...s are Off at the power board The mixer electronic timer is set to 0 Turn On Set time setting or set electronic timer to 0 to allow manual operation Mixer stops during operation Mixer overload tripped...

Страница 11: ...be completed signed and a copy kept in the personnel files for future reference Supervisors to Ensure Competency check lists are copied and completed as part of the training of staff Correct training...

Страница 12: ...s Identify OH S reporting procedures related to hazard reporting for this machine Comments To gain competency in the use of the PARAMOUNT PLANETARY MIXER the assessor must be satisfied that the operat...

Страница 13: ...ygiene and sanitation Actual and potential contamination and spoilage hazards Solutions to rectify contamination and spoilage problems Use work practices and methods that reduce the risk of product co...

Страница 14: ...operate Major injuries Unlikely Moderate Service panels should not be removed whilst the machine is in operation nor still connected to the power supply The machine must not be operated with any serv...

Страница 15: ...M60AT 12 004 Stainless Steel Wire Whip BM60AT 12 002 Batter Beater BM60AT 06 003 HUB Attachment Drive HL GL12SH Mincer HL VS12A Slicer Shredder BM60ATM 30 litre Reduction Kit includes Bowl Hook Beater...

Страница 16: ...14 Wiring Diagrams Single Phase Models Three Phase Models...

Страница 17: ......

Отзывы: