background image

 

 

www.parametric.ch/product/pcr2-ods

 

Setup 
 

You can open the device to access the USB configuration port to change device settings. 
 

 

  Remove the four screws from 

the casing to gain access to the 
device. 

 

  Carefully open the enclosure 

while making sure not to yank 
the cables connecting the two 
electronic parts in the top and 
the bottom of the casing. 

 

 

 

 

 

  Connect the sensor to your 

Computer with a USB Cable 
using the Config Port. 
 
 
 

 

Содержание PCR2-EU868-ODS

Страница 1: ...EN PCR2_ODS_Quickstart_Guide_en 055 QUICKSTART GUIDE LoRaWAN Solar Radar People Counter Outdoor PCR2 EU868 ODS PCR2 US915 ODS PCR2 AU915 ODS PCR2 AS923 ODS...

Страница 2: ...parametric ch product pcr2 ods What is in the box Please check for the following content in your box Optional 1 Solar Panel 18V 2 MT40 Pole Mount 3 Extension Cable 4 Solar Panel Bracket Device 5 PCR2...

Страница 3: ...nge device settings Remove the four screws from the casing to gain access to the device Carefully open the enclosure while making sure not to yank the cables connecting the two electronic parts in the...

Страница 4: ...the PPX Configurator tool After some seconds you will see the device information and settings Device information includes sensor type serial number firmware shipping date hardware and warranty days l...

Страница 5: ...inutes During this time all persons will be counted and sums are transferred After transfer counters will be reset Overview of LoRaWAN Settings Confirmed Uplinks Send uplinks with ACK requests LinkChe...

Страница 6: ...Initial Charge Level After connecting the battery or after a reset by pressing the button for 30s the SBX charger initializes the battery once This is done by charging up to the Initial Charge Level...

Страница 7: ...g Charging Active Installation PCR2 ODS are shipped with a disconnected battery for safety reasons Connect the battery pack cable to the circuit board If the battery LED blinks rapidly the battery vol...

Страница 8: ...ar unit will be switched on when the voltage is above 6 6 When the solar charger ist powered the first time the battery will be charged to a minimum of 8 1V before switching on the radar This is becau...

Страница 9: ...opleflow walking along a virtual line The device can be mounted on walls poles or over head Wall mounting recommended Installation height 1 2 1 4m 4 5 feet above floor Installation direction Device su...

Страница 10: ...lation height 0 5 4m above peoples heads Installation direction Heading down LEDs in line with direction of movement Separation angle 40 Distance between persons Avoid Side by side walking Groups Too...

Страница 11: ...esting Counting functionality can be checked by 2 direction leds RTL LED blinks when object detected from right LTR LED blinks when object detected from left If both LEDs are blinking the device is tr...

Страница 12: ...EN 55024 2010 2011 09 01 IEC 61000 4 2 2008 2008 12 09 IEC 61000 4 3 2006 A1 2007 A2 2010 2010 04 27 IEC 61000 4 4 2012 2012 04 30 IEC 61000 4 5 2014 2014 05 15 IEC 61000 4 6 2013 2013 10 23 IEC 61000...

Отзывы: