1. Installation
4821-A2-GN20-00
April 2002
1-13
Installing the Management Module
Each BitStorm 4800 requires a Model 4800 Management Module or a Model 4804
Management Module with V.35/X.21 uplink. If your Management Module was
shipped separately from the BitStorm 4800, install the Management Module
before you connect the BitStorm 4800 to a power source.
HANDLING PRECAUTIONS FOR
STATIC-SENSITIVE DEVICES
This product is designed to protect sensitive components from damage
due to electrostatic discharge (ESD) during normal operation. When
performing installation procedures, however, take proper static control
precautions to prevent damage to equipment. If you are not sure of the
proper static control precautions, contact your nearest sales or service
representative.
Procedure
To install a Management Module:
1. Remove the two screws holding the slot cover on the BitStorm 4800.
2. Store the slot cover; retain the screws.
!
02-17068
OK
ALARM
TEST
1
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
47
MGMT
UPLINK
GigE
3
5
7
11
13
15
17
19
9
21
23
25
27
29
31
33
35
37
39
41
43
45
Содержание BitStorm 4800 Express
Страница 1: ...BitStorm 4800 Installation Guide Document No 4821 A2 GN20 00 April 2002 ...
Страница 48: ...4 Configuration 4 6 April 2002 4821 A2 GN20 00 ...
Страница 60: ...A Connectors Cables and Pin Assignments A 12 April 2002 4821 A2 GN20 00 ...
Страница 68: ...Index IN 4 April 2002 4821 A2 GN20 00 ...