1. Installation
1-8
April
2002
4821-A2-GN20-00
Installing the BitStorm 4800 Into a Rack
Two types of mounting screws are provided. Use:
#10-32 mounting screws for rails with threaded screw holes
#12-24 mounting screws and self-retaining nuts for rails with unthreaded
screw holes
Procedure
To install the BitStorm 4800 into a rack:
1. Determine where in the rack you will mount the BitStorm 4800. If your rack
does not have threaded screw holes, slip self-retaining nuts onto the rails
where the BitStorm 4800 will be fastened.
02-17070
Содержание BitStorm 4800 Express
Страница 1: ...BitStorm 4800 Installation Guide Document No 4821 A2 GN20 00 April 2002 ...
Страница 48: ...4 Configuration 4 6 April 2002 4821 A2 GN20 00 ...
Страница 60: ...A Connectors Cables and Pin Assignments A 12 April 2002 4821 A2 GN20 00 ...
Страница 68: ...Index IN 4 April 2002 4821 A2 GN20 00 ...