2
Quick Start Procedure
The following procedure is for experienced DSU/CSU users who are familiar with the
3161 DSU/CSU installation process and have no special requirements for their
application. See the
ACCULINK 316x Data Service Unit/Channel Service Unit
Operator’s Guide
for more information.
1. Install the Auxiliary Backplane onto the 3000 Series Carrier. See the
ACCULINK
3151 CSU and 3161 DSU/CSU General Information Guide
(3100-A2-GK40) for
installation procedures.
2. Attach the DTE cable (DB15) and/or port cables (DB25) to the appropriate
connectors on the Auxiliary Backplane. See the
COMSPHERE 3000 Series Carrier
Installation Manual
(3000-A2-GA31)
for detailed cable and connector information.
Connect the other end of the DTE cable to the customer premises equipment.