
3
7610-A2-GN10-20
November 1997
Site Preparation
Make sure you have:
A dedicated, grounded ac outlet that is protected by a circuit breaker within
6 feet of the access unit.
A clean, well-lit, and ventilated site that is free from environmental extremes.
One to two feet of clearance for cable connections.
An operable network connection.
An asynchronous terminal or PC with terminal emulation software.
Installing Your DSU
496-15091
RJ48S
Jack
NETWORK
TERMINAL
MANAGEMENT
POWER
D
T
E
DTE
Management
Connection
Terminal
Connection
Power
Connection
Network
Connection
DTE
Connection