
Messages and Troubleshooting
6-2
7520-A2-GB20-20
May 1998
Table 6-1.
Device Messages (2 of 2)
Device Message
What To Do
What Message Indicates
Invalid Test
Combination
A loopback or 511 pattern
test was in progress when
Start was selected to start
another test, or was active
on the same or another
interface when Start was
selected.
Wait until other test ends and
message clears.
Abort all tests from the Test
menu screen.
Stop the test from the same
screen the test was started
from.
Please Wait
Command takes longer
than 5 seconds.
Wait until message clears.
Test Active
A test is running and no
higher priority health and
status messages exist.
Contact service provider if test
initiated by the network.
Wait until the other test ends
and message clears.
Cancel all tests from the Test
screen.
Stop the test from the same
screen the test was started
from.
Содержание 7520
Страница 1: ...MODEL 7520 DSU USER S GUIDE Document No 7520 A2 GB20 20 May 1998...
Страница 6: ...Contents iv 7520 A2 GB20 20 May 1998 This page intentionally left blank...
Страница 24: ...Customizing the DSU 3 4 7520 A2 GB20 20 May 1998 This page intentionally left blank...
Страница 36: ...Monitoring the DSU 4 12 7520 A2 GB20 20 May 1998 This page intentionally left blank...