Page 21 of 28
Part No. 100318 Rev. 1
Issued: 2021-06-08
11-B) If two solar panels are being installed, orient the solar panels as shown below with the
black electrical connections approximately 2 inches apart. Mark the locations of the electrical
connections and drill two 7/8” holes at the marked locations. Insert the electrical wires into the
power pack and secure the solar panels using double-sided tape.
Verify Assembly
CAUTION!
Check that all bolts have been tightened and cotter pins bent.
Be careful when working around hydraulics and battery, wear eye protection.
WARNING!
Check that the hydraulic hose is routed under the side beam and that there
are no pinch points.
Test the lift initially with no load, actuate it several cycles. Verify that no
fittings are leaking and there are no hose pinch points. Apply additional
lubrication to pins if squeaky and tighten any leaking fittings.
10.75”
2”
15.3”
16.3”
3”