• Route the SECONDARY CABLE (32) around the pulley and retaining clip.
(NOTE: The bolt holding pulley and retaining clip may need
to be loosened to align cable retaining clip with cable.)
FIGURE 23
STEP 23
•
SECURELY
assemble one 3-1/2” PULLEY (34) to the tab on the BASE (1) using one 3/8 X 2” BOLT (64), two 3/8” WASHERS (51), one
2-3/8” CABLE RETAINING CLIP (49), and one 3/8” LOCK NUT (50) as shown in FIGURE 23.
18
3/8 X 2” 64
32
1
51
49
34
50