PG-1210 Service Manual
6.5.2 Power Supply Check Point
Step
Test point
Typical Value
Condition
Checking Point
2-1
U504
Pin#1
3.8V
2,3,4,5,6,7
Check route connection : VBAT
2-2
U504
Pin#5
2.8V
2,3,4,5,6,7
Check route connection : VCC_RFCHIP
2-3
U505
Pin#3,8,20
3.8V
2,3,4,5,6,7
Check route connection : VBAT
Step 2-1
Step 2-2
Fig.6-1
U504 Regulator
Power Supply Schematic
Step 2-2
Step 2-1
Fig.6-2 U504 Regulator Power Supply PCB Layout
38
PANTECH
Содержание PG-1210
Страница 21: ...PG 1210 Service Manual CP101 CP101 20 PANTECH...
Страница 24: ...PG 1210 Service Manual 8 Check to see if U509 and C132 C129 R130 is 2 8V_MEM CP105 CP105 CP105 23 PANTECH...
Страница 37: ...PG 1210 Service Manual CP129 36 PANTECH...
Страница 40: ...PG 1210 Service Manual Step 2 3 Fig 6 3 U505 PAM s Power Check Point 39 PANTECH...
Страница 42: ...PG 1210 Service Manual STEP 3 2 STEP 3 1 Fig 6 5 U505 PAM TX_PA and DCS SEL Test Point Circuit 41 PANTECH...